engineering:jul22_10

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
engineering:jul22_10 [2010/07/21 17:29] – created priscaengineering:jul22_10 [2010/07/22 10:21] (current) prisca
Line 4: Line 4:
   * AARM meeting in Lead, SD in Fall   * AARM meeting in Lead, SD in Fall
     * Idea for focus: All ISE reps and DULBCF plan     * Idea for focus: All ISE reps and DULBCF plan
-  * Dates:  +  * Dates: Fri/SatOct 15/16, 22/23, 29/30, Nov 12/13 or 19/20
-  * Dates?? Combine with TownHall Meeting?? +
-  * Focus? +
-  * Advertize at LRT? Forge a relationship there? Integration efforts?=== Cost and Schedule === +
-  * Project is mostly complete - What still needs to be done? Lee Petersen +
-  * New Drawings {{:engineering:image-6231548-0001.pdf|scanned version}}+
  
-=== Begin Simulations/Studies in earnest === +=== LRT === 
-  * USD plans - Dong Ming +== Session 9 – Discussion on co-ordination and resource sharing == 
-  * BHSU plans Kara Keeter +  -  Coordinated use of HPGe gamma-ray spectrometers, other gamma-ray and neutron detectors by different groups/collaborations;  
-  * UMinn plans - Prisca Cushman +  - Databases of material purity;  
-  * Syracuse plans - Richard Schnee+  - Joint purchasing of radio-pure materials;  
 +  - Monte Carlo simulation tools;  
 +  - Radon emanation measurements;  
 +  - Purification processes etc. 
 + 
 +=== Interacting with agencies and DUSEL === 
 +  * S4 Review Process and Summary 
 +  * PAC meeting at DUSEL July 27-28 
 + 
 +=== Engineering priorities === 
 +  * Acrylic design (Acrylic thickness + support structure) 
 +  * Masonry ==> steel + panels.  Architects? 
 +  * Framework for PMTs 
 +  * Floor height of module and influence on shield door