Campuses:
This shows you the differences between two versions of the page.
Next revision | Previous revision | ||
engineering:jul22_10 [2010/07/21 17:29] – created prisca | engineering:jul22_10 [2010/07/22 10:21] (current) – prisca | ||
---|---|---|---|
Line 4: | Line 4: | ||
* AARM meeting in Lead, SD in Fall | * AARM meeting in Lead, SD in Fall | ||
* Idea for focus: All ISE reps and DULBCF plan | * Idea for focus: All ISE reps and DULBCF plan | ||
- | * Dates: | + | * Dates: |
- | * Dates?? Combine with TownHall Meeting?? | + | |
- | * Focus? | + | |
- | * Advertize at LRT? Forge a relationship there? Integration efforts?=== Cost and Schedule === | + | |
- | * Project is mostly complete - What still needs to be done? Lee Petersen | + | |
- | * New Drawings {{:engineering: | + | |
- | === Begin Simulations/Studies in earnest | + | === LRT === |
- | * USD plans - Dong Ming | + | == Session 9 – Discussion on co-ordination and resource sharing == |
- | * BHSU plans - Kara Keeter | + | - Coordinated use of HPGe gamma-ray spectrometers, |
- | * UMinn plans - Prisca Cushman | + | - Databases of material purity; |
- | * Syracuse plans - Richard Schnee | + | - Joint purchasing of radio-pure materials; |
+ | - Monte Carlo simulation tools; | ||
+ | - Radon emanation measurements; | ||
+ | - Purification processes etc. | ||
+ | |||
+ | === Interacting with agencies and DUSEL === | ||
+ | * S4 Review Process and Summary | ||
+ | * PAC meeting at DUSEL July 27-28 | ||
+ | |||
+ | === Engineering priorities === | ||
+ | * Acrylic design (Acrylic thickness + support structure) | ||
+ | * Masonry ==> steel + panels. | ||
+ | * Framework for PMTs | ||
+ | * Floor height of module and influence on shield door |