Campuses:
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
engineering:jul22_10 [2010/07/21 17:35] – prisca | engineering:jul22_10 [2010/07/22 10:21] (current) – prisca | ||
---|---|---|---|
Line 7: | Line 7: | ||
=== LRT === | === LRT === | ||
+ | == Session 9 – Discussion on co-ordination and resource sharing == | ||
+ | - Coordinated use of HPGe gamma-ray spectrometers, | ||
+ | - Databases of material purity; | ||
+ | - Joint purchasing of radio-pure materials; | ||
+ | - Monte Carlo simulation tools; | ||
+ | - Radon emanation measurements; | ||
+ | - Purification processes etc. | ||
- | === S4 Review Process === | + | === Interacting with agencies and DUSEL === |
- | + | * S4 Review Process and Summary | |
- | === Begin Simulations/ | + | * PAC meeting at DUSEL July 27-28 |
- | * Water Shield | + | |
- | * Scint Studies | + | |
=== Engineering priorities === | === Engineering priorities === | ||
- | * Acrylic design | + | * Acrylic design |
* Masonry ==> steel + panels. | * Masonry ==> steel + panels. | ||
- | * | + | * Framework for PMTs |
+ | * Floor height of module and influence on shield door |