Line 1: Line 1:
 ====== Agenda for March 25, 2010 ====== ====== Agenda for March 25, 2010 ======
  
-  * Another teleconfGo over new shortened drawings.  Compare with our suggestions. +  * Slides  DEDC is requesting slides TODAY (see Derek's email - forwarded) 
-For New Drawing click on newest version from [[engineering:concept|here]] Discussion of "red lines" is found   [[engineering:feb25_10|here]] +  * Timescale for cost changes  
-Reminder: Overhead crane already exists for each module. +  * July 13-15 
-  * Results of discussions between Bob Altes and Lee Petersen re Water Shield Engineering. [[engineering:waterengineering|files]] +  * High Priority Working Groups (see [[:collab|People]] for suggestions 
-  How do we move forward on costing?   +    Shield (Lee, Bob, Prisca, Jeff Martoff, Frank Calaprice 
- +    * Tank (LS: Kara, Richard Ford, )(Ge: KaraEric 
-DEADLINE 1: Prepare a List of the items you need to cost and send it to Lee and myself next week BEFORE the meeting (we can all use them to sharpen our discussion with colleagues) +    * Screeners (DongMing, Richard S, Jodi 
- +  * Fill in the WBS Lee sent  (see recent email attachment
-DEADLINE 2: March 22. The Monday after the Collab Meeting. Send your results to Lee and he will collate for the Thursday March 25 teleconf. +  * Go over new drawing (see recent email attachment from Lee
- +    * Tank placement 
-    - Need cost for each type of screener x N (DongMing, Richard, Jodi) +    * Screeners outside 
-    - Additional shieldingcranes(cryogens must be operations?) and anything else related to running the screeners (DongMing, Richard, Jodi) +    * Modular shield vs stick built Cost 
-    - Water shield:  Active Water + Gd includes PMTs (Lee, Bob, Prisca) +   
-    - Water Purification system (Lee) +
-    - Immersion Tank: Need best estimate for a scaled down CTF  (Kara and experts she finds, like Richard.. who else?+
-    - Other Immersion tank needs: Clean room on top, LN blanket, ??  (Kara+
-    - Machine Shop (Lee, Prisca) +
-    - Sample Rooms, Entry, offices, power, air, etc. (Lee - based on the drawings)  +
-    - Should we include NAA, Radiochemistry, Surface bldg in our cost estimate or will we look too expensive? +
-  Collaboration Meeting Details (end of NEXT WEEK!) [[:meeting|Meeting Page]] +