 ===== Agenda for May 27, 2010 ===== ===== Agenda for May 27, 2010 =====
 +=== Cost and Schedule ===
 +  * New Plan - Understand that Module ready by 2017 => no screening until 2019
 +    * Procure and deploy screeners early as part of DULBCF
 +    * Build up staff and screen 2011 - 2019
 +    * Create integration of Davis, LBL, Soudan with a surface facility at USD (Keenan head)
 +    * Need more money for this!  Need Plan - Physics Frontier Center?
 +    * Move already bought screeners into FAARM - schedule moves for uninterrupted screening (except one very sensitive screener will move early and monitor all activities, including tank fill) 
 +    * FAARM is the active shielding, infrastructure, and immersion tank
 +    * Any other specialty screeners  (what about radon emanation? early or late?)
 +  * Reflect this new plan in Microsoft Project (Lee Petersen)
  
 +=== New Layout ===  
 +  * {{http://zzz.physics.umn.edu/lowrad/engineering/concept|see latest here}}
 +  * Plastic removed from under torus
 +  * questions of floor height and opening not resolved
 +  * need to understand acrylic options - should we bring in other engineers? other companies?
 +  * Any news from Dufrane?
  
-  * Quick Summary of April Review 
-  * May 17 (Monday) meeting with DUSEL {{:engineering:template_for_dusel_m_145c88.ppt|Template Slides}} 
-  * Schedule being put into MicroSoft Project 
-  * Working Group Reports (see jobs below for reference) 
- 
-=== Water Shield ===   
-== Make it real, talk to companies, do the engineering e.g. == 
-  * New Acrylic Companies contacted 
-  * Outer tank engineering 
-== Develop infrastructure into shield (ductwork, electrical etc) == 
 === Screener Group === === Screener Group ===
-== Work with Yuen-Dat to compile results of survey == +  * Not much heard from groups in response to DUSEL poll 
-== Define parameters of shielding and common elements between screeners == +  * Screener group (Richard?) needs to gather info by ISE and post to [[groups:screenwhite|Screening Working Group White Paper]] by next meeting 
-== Plan for screening at Sanford and schedule of installation and move ==+  * I will call each group afterward to solicit further info and to solidify support for DULBCF 
 + 
 === Immersion Tank === === Immersion Tank ===
-== Continue cost and schedule for CTF == +  * posted first pass on wiki: needs more detailed schedule and cost 
-== compile relevant sections of survey (poll community about the functionality of the ultra sensitive screener) == +     
-=== Characterization === +=== short term plans for this summer === 
-== short term plans for this summer == +  * Nail down the schedule for the Mid-July for undergrads from U Minn, SD, BHSU 
-  * Mid-July for 2 weeks for undergrads from U Minn, SD, BHSU +  * Need place to stay - Kara said she would find one 
-  * Radon survey +
-  * Geographic survey +
-  * Need place to stay - who will find that? +
-== long term plans for neutron work - neutron detectors at Soudan? ==+
  
  