Campuses:
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
engineering:nov6_12 [2012/11/07 10:42] – prisca | engineering:nov6_12 [2012/11/07 12:10] (current) – prisca | ||
---|---|---|---|
Line 1: | Line 1: | ||
===== Agenda for Nov 7, 2012 ===== | ===== Agenda for Nov 7, 2012 ===== | ||
- | ==== March 5 meeting at SLAC ==== | + | ==== March 4 meeting at SLAC ==== |
* Announcement - finish a draft announcement today - will need immediate feedback | * Announcement - finish a draft announcement today - will need immediate feedback | ||
+ | === 8:30-9:00 Introduction to our plans and working groups === | ||
=== 9-12: Simulation | === 9-12: Simulation | ||
- Advances in Geant4 (Dennis Wright) | - Advances in Geant4 (Dennis Wright) | ||
- | - Advances in FLUKA (SLAC name?) | + | - Advances in FLUKA (SLAC Mario/ |
- Fluka v Geant comparisons | - Fluka v Geant comparisons | ||
- | - Tony & Anthony update | + | - Tony, Anthony, Allison |
- Melinda update on FLUKA v Geant in NMM context | - Melinda update on FLUKA v Geant in NMM context | ||
- | | + | |
- | | + | |
* Muon generation and inclusion in FLUKA and Geant4 (e.g. MUSUN v Geant4) | * Muon generation and inclusion in FLUKA and Geant4 (e.g. MUSUN v Geant4) | ||
- | | + | * Muon-Nuclear vs. other processes neutron energy contribution |
+ | | ||
+ | * Posted longer talks if they already exist | ||
+ | - Status of the Depth Task Force Simulations (LAr, LXe, Ge) | ||
=== 1-3: Radiogenic Challenge === | === 1-3: Radiogenic Challenge === | ||
+ | - Universal Database: | ||
+ | - Status of alpha n measurements (DongMing revise this title) | ||
+ | - Discussion and Planning for additional data | ||
+ | - Notre Dame, TUNL, ?? DongMing please advise. | ||
+ | - Planning for how to combine (or not) Materials database, Geant4, alpha-n etc. | ||
+ | - talking about radiogenic measurements/ | ||
+ | |||
=== 3:30-5:30 Experimental Handles on Neutron Bkgd === | === 3:30-5:30 Experimental Handles on Neutron Bkgd === | ||
+ | - NMM (Melinda or Ray) | ||
+ | - SD neutron detector (Chao) | ||
+ | - Muon system and time stamps (Anthony) | ||
+ | - Plans for upgrades and new instruments at Soudan(several people? | ||
+ | - Other sites and other experiments? | ||
+ | === 6-7 AARM Planning meeting === | ||
+ | - Recruiting people for the working groups | ||
+ | - Plans for LRT2013 | ||
+ | - How to organize around the Cosmic Frontier workshop | ||
+ | * Liason jobs and info gathering? | ||
+ | * Capabilities tie-in? | ||
+ | * Screening Facility? | ||
+ | === Group Dinner === | ||
==== LRT at Gran Sasso - April 10-12 (Jodi) ==== | ==== LRT at Gran Sasso - April 10-12 (Jodi) ==== | ||
* Status (letter) | * Status (letter) |