Line 1: Line 1:
 ====== Water Shield Design Issues ====== ====== Water Shield Design Issues ======
  
-  * {{:engineering:prelim_water_shield_12-22-09.pdf|Sketches and Calcs}}+  * {{:engineering:prelim_water_shield_12-22-09.pdf|Sketches and Calcs, referred to below}}
   * Stick-Built Construction vs. Modular Construction   * Stick-Built Construction vs. Modular Construction
     - Stick-Built construction -- The water shield would be constructed in place in the FAARM space, from components transported underground.     - Stick-Built construction -- The water shield would be constructed in place in the FAARM space, from components transported underground.