- | ====== Bio Storage and Sample Prep ====== | ||
- | |||
- | |||
- | - Description/ | ||
- | (to be filled out by Onstott/ | ||
- | * QUESTION: Do you want separate rooms for bio vs geo or for storage vs prep? | ||
- | If so, you can make 2 of these lists.... | ||
- | - Planned use (be specific): | ||
- | - Primary function: | ||
- | - Temporary and permanent storage: We will require two -20oC freezers, a refrigerator, | ||
- | - Sample and detector handling: | ||
- | - Jigs, fixtures, scaffolds, etc. necessary | ||
- | - E & O activities - none planned at this location - E&O will be associated with biofilm experiments outside FAARM facility | ||
- | - Occupancy: | ||
- | - Steady: | ||
- | - Peak: perhaps 5, including post-docs or graduate students. | ||
- | - Adjacencies (list/ | ||
- | - Space size (gsf and/or WxLxH): | ||
- | - Experiment Systems: GC with gas proportional counter, phosphor imager, multiphoton decay coincidence counter, isotope microarray analyzer (epifluorescent microscope in a dark closet) and beta cage - if this equipment is to be located on the ground floor in the water shield then we can reduce the size of our room. | ||
- | - Shielding: what ever is required to achieve 10^-5 counts/ | ||
- | - Floor load (PSF): again, nothing special here - ~10 PSF? | ||
- | - Material handling (cranes, etc.) - not necessary - fork lift to elevator to get equipment into Bio Bay. | ||
- | - Finishes (walls/ | ||
- | - Casework: | ||
- | - Storage: we would probably only keep low-level samples that are actively being counted in the lab along with counting equipment. | ||
- | - Furniture/ | ||
- | - Mechanical: | ||
- | - Environmental conditions: | ||
- | - Clean class: 2,000 | ||
- | - Ventilation: | ||
- | - Exhaust: | ||
- | - Plumbing (domestic, waste, systems): | ||
- | - Fire Suppression: | ||
- | - Building Management System: | ||
- | - Fume hoods: one fume hood for acid digestion | ||
- | - Chilled water: no, but D.I. water would be good | ||
- | - Other: | ||
- | - Electrical: | ||
- | - Power (clean and dirty): | ||
- | - Lighting: yes - whatever the facility decides | ||
- | - Low Voltage/ | ||
- | - Fire Detection/ | ||
- | - Other: | ||
- | - Acoustical: none | ||
- | - Vibration Isolation: just a vibration isolation bench for the microscope | ||
- | - EMI/RFI Isolation: I don't know what this means. | ||
- | - Hazardous materials: Need to be able to dispose of biological samples with low activity for transport to the surface. | ||