Go to the U of M home page
School of Physics & Astronomy
Assay and Acquisition of Radiopure Materials

User Tools


faarm:faarmi

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
faarm:faarmi [2009/11/05 06:21] priscafaarm:faarmi [2009/12/22 12:59] (current) – removed ben
Line 1: Line 1:
-====== FAARM at 4850 ====== 
- 
- 
-  - Description/Name:  The entire clean room area that includes a water shielded section with screeners and ultra-sensitive water tank, but also any clean machine shop, assembly, sample storage which is outside the water shield.  Does not include the shared assembly space outside the clean room.   
-  - Planned use (be specific): 
-     - Primary function: Screening of materials and Protoyping of experimenta to be used in DUSEL experiments 
-     - Temporary and permanent storage: temporary radon-free storage of materials awaiting screening,  
-     - Sample and detector handling: 
-     - Jigs, fixtures, scaffolds, etc. necessary: Specified under subunits PLUS  
-      * ?? here or under material handling?? 
-      * overhead crane in water shielded room (30 ton) 
-      * platform and clean room over tank(s) 
-      * scaffolding to access the water shield and the muon veto 
-      * stairs and platforms for water tank and shield 
-     - E & O activities: Some screening time reserved for outside projects from schools and communities. Projects will need approval from E&O organizers  
-  - Occupancy: 
-     * Steady: 5 
-     * Peak: 30 
-  - Adjacencies (list/distance): 
-  - Space size (gsf and/or WxLxH): Need to start making pictures 
-  - Experiment Systems: 
-  - Shielding: 
-  - Floor load (PSF): Divide into different rooms (water shielded room, water shield itself, clean areas 1st floor, clean areas 2nd floor) 
-    * Weight of ultra sensitive tank  
-    * Weight of shielding around the screeners 
-    * Offices with people and computers 
-    * Weight of water shield (ouside floor with tank??) 
-    * Machine shops (machinery) 
-    * Storage and sample handling containers 
- 
-  - Material handling  
-    * overhead crane (30 ton) - don;t double count 
-    * Clean fork lift 
-    * Clean carts 
-    * 3-4 moveable cranes 
- 
-  - Finishes (walls/floor/ceiling): 
-  - Casework: 
-  - Storage: 
-   * closets for clothes/bunny suits 
-   * nitrogen purge cabinets 
-  - Furniture/Fixtures/Equipment (non-experiment): 
-  - Mechanical: 
-     - Environmental conditions: 
-     - Clean class: 
-     - Ventilation: 
-     - Exhaust: 
-     - Plumbing (domestic, waste, systems): 
-       * hazardous waste disposal  
-     - Fire Suppression: 
-     - Building Management System: 
-     - Fume hoods: 
-     - Chilled water 
-       * Purified water here instead?? 
-     - Other:  
-  - Electrical: 
-     - Power (clean and dirty): 
-     - Lighting: 
-     - Low Voltage/Data/Communication:  
-     - Fire Detection/Alarm: 
-     - Other:  
-  - Acoustical: no special requirement 
-  - Vibration Isolation: ?? 
-  - EMI/RFI Isolation: ?? 
-  - Hazardous materials:  
-  - Special Consideration (expansion, etc.): 
  
faarm/faarmi.1257423695.txt.gz · Last modified: 2009/11/05 06:21 by prisca