| - | ====== FAARM at 4850 ====== | ||
| - | |||
| - | |||
| - | - Description/ | ||
| - | - Planned use (be specific): | ||
| - | - Primary function: Screening of materials and Protoyping of experimenta to be used in DUSEL experiments | ||
| - | - Temporary and permanent storage: temporary radon-free storage of materials awaiting screening, | ||
| - | - Sample and detector handling: | ||
| - | - Jigs, fixtures, scaffolds, etc. necessary: Specified under subunits PLUS | ||
| - | * ?? here or under material handling?? | ||
| - | * overhead crane in water shielded room (30 ton) | ||
| - | * platform and clean room over tank(s) | ||
| - | * scaffolding to access the water shield and the muon veto | ||
| - | * stairs and platforms for water tank and shield | ||
| - | - E & O activities: Some screening time reserved for outside projects from schools and communities. Projects will need approval from E&O organizers | ||
| - | - Occupancy: | ||
| - | * Steady: 5 mostly in the office space | ||
| - | * Peak: 30 (check subunits) | ||
| - | - Adjacencies (list/ | ||
| - | - Space size (gsf and/or WxLxH): | ||
| - | - Experiment Systems: | ||
| - | - Shielding: | ||
| - | - Floor load (PSF): Divide into different rooms (water shielded room, water shield itself, clean areas 1st floor, clean areas 2nd floor) | ||
| - | * Weight of ultra sensitive tank | ||
| - | * Weight of shielding around the screeners | ||
| - | * Offices with people and computers | ||
| - | * Weight of water shield (ouside floor with tank??) | ||
| - | * Machine shops (machinery) | ||
| - | * Storage and sample handling containers | ||
| - | - Material handling | ||
| - | * overhead crane (30 ton) - do';t double count | ||
| - | * Clean fork lift | ||
| - | * Clean carts | ||
| - | * 3-4 moveable cranes | ||
| - | * extension ladders | ||
| - | - Finishes (walls/ | ||
| - | - Casework: | ||
| - | - Storage: | ||
| - | * closets for clothes/ | ||
| - | * nitrogen purge cabinets | ||
| - | - Furniture/ | ||
| - | - Mechanical: | ||
| - | - Environmental conditions: | ||
| - | - Clean class: | ||
| - | - Ventilation: | ||
| - | - Exhaust: | ||
| - | - Plumbing (domestic, waste, systems): | ||
| - | * hazardous waste disposal | ||
| - | - Fire Suppression: | ||
| - | - Building Management System: | ||
| - | - Fume hoods: | ||
| - | - Chilled water | ||
| - | * Purified water here instead?? | ||
| - | - Other: | ||
| - | - Electrical: | ||
| - | - Power (clean and dirty): | ||
| - | - Lighting: | ||
| - | - Low Voltage/ | ||
| - | - Fire Detection/ | ||
| - | - Other: | ||
| - | - Acoustical: no special requirement | ||
| - | - Vibration Isolation: ?? | ||
| - | - EMI/RFI Isolation: ?? | ||
| - | - Hazardous materials: | ||
| - | - Special Consideration (expansion, etc.): | ||