| - | ====== Gamma Counting Stations ====== | ||
| - | |||
| - | |||
| - | - Description/ | ||
| - | - Planned use (be specific): | ||
| - | - Primary function: Materials screening | ||
| - | - Temporary and permanent storage: *Separated sample storage rooms for screening and for keeping | ||
| - | - Sample and detector handling: *Clean room with class 10,000, liquid nitrogen, | ||
| - | - Jigs, fixtures, scaffolds, etc. necessary: Jigs for sample preparation; | ||
| - | - E & O activities: daily (emergency 24/7); Training students | ||
| - | - Occupancy: | ||
| - | - Steady: Two people | ||
| - | - Peak: Ten people | ||
| - | - Adjacencies (list/ | ||
| - | - Space size (gsf and/or WxLxH): 4 m x 6 m x 4 m | ||
| - | - Experiment Systems: Germanium low background detectors and DAQ system | ||
| - | - Shielding: Very stout floor for shield; Copper, lead, poly bricks, water walls | ||
| - | - Floor load (PSF): (Pb ~12 g/cm3) a 1-m high shield would be 1,200 g/cm2 or about 2400 lbs/ft2. Round up for safety ~ 1.5 tons/ft2. | ||
| - | - Material handling (cranes, etc.) Movable crane/floor rail for heavy item movement | ||
| - | - Finishes (walls/ | ||
| - | - Casework: | ||
| - | - Storage: purge cabinets; LN2 | ||
| - | - Furniture/ | ||
| - | |||
| - | - Mechanical: | ||
| - | - Environmental conditions: Radon reduced air, temperature and humility control | ||
| - | - Clean class: 10,000 | ||
| - | - Ventilation: | ||
| - | - Exhaust: ~ 100 cfm | ||
| - | - Plumbing (domestic, waste, systems): water, heating/ | ||
| - | - Fire Suppression: | ||
| - | - Building Management System: Preparation room for changing PPE and keeping the note books | ||
| - | - Fume hoods: 1 (ea 4x5ft^2=20ft^2: | ||
| - | - Chilled water | ||
| - | - Other: | ||
| - | - Electrical: | ||
| - | - Power (clean and dirty): clean 15 kw | ||
| - | - Lighting: room lights | ||
| - | - Low Voltage/ | ||
| - | - Fire Detection/ | ||
| - | - Other: | ||
| - | - Acoustical: | ||
| - | - Vibration Isolation: | ||
| - | - EMI/RFI Isolation: | ||
| - | - Hazardous materials: General waste disposal: 1 hazardous chemical disposal: 1 lead contaminated ppe disposal: OSHA compliant layout | ||