Campuses:
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
faarm:immersioni [2009/12/01 09:03] – prisca | faarm:immersioni [2009/12/22 13:01] (current) – removed ben | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== Ulta Sensitive Immersion Tank ====== | ||
- | |||
- | |||
- | - Description/ | ||
- | - Planned use (be specific): | ||
- | - Primary function: | ||
- | - Temporary and permanent storage: | ||
- | - Sample and detector handling: | ||
- | - Jigs, fixtures, scaffolds, etc. necessary: upper deck scaffolding; | ||
- | - E & O activities: grad student and postdoc training. No public use | ||
- | - Occupancy: | ||
- | - Steady: | ||
- | - Peak: 8 | ||
- | - Adjacencies (list/ | ||
- | - Space size (gsf and/or WxLxH): | ||
- | - Experiment Systems: | ||
- | - Shielding: | ||
- | - Floor load (PSF): | ||
- | - Material handling (cranes, etc.) | ||
- | - crane for lifting samples in and out (load?) | ||
- | - Finishes (walls/ | ||
- | - Casework: | ||
- | - Storage: | ||
- | - Furniture/ | ||
- | - Mechanical: | ||
- | - Environmental conditions: | ||
- | - Clean class: | ||
- | - Ventilation: | ||
- | - Exhaust: | ||
- | - Plumbing (domestic, waste, systems): | ||
- | - Fire Suppression: | ||
- | - Building Management System: | ||
- | - Fume hoods: | ||
- | - Chilled water | ||
- | - Other: | ||
- | - Electrical: | ||
- | - Power (clean and dirty): for PMTs, DAQ | ||
- | - Lighting: | ||
- | - Low Voltage/ | ||
- | - Fire Detection/ | ||
- | - Other: | ||
- | - Acoustical: | ||
- | - Vibration Isolation: | ||
- | - EMI/RFI Isolation: | ||
- | - Hazardous materials: | ||
- | - Special Consideration (expansion, etc.): | ||