Go to the U of M home page
School of Physics & Astronomy
Assay and Acquisition of Radiopure Materials

User Tools


faarm:newscreeni

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
faarm:newscreeni [2009/11/05 06:32] priscafaarm:newscreeni [2009/12/22 13:03] (current) – removed ben
Line 1: Line 1:
-====== Novel Screeners and R&D Space ====== 
- 
- 
-  - Description/Name: Space reserved for new screener or prototyping either screeners or experiments 
-  - Planned use (be specific): 
-     - Primary function: 
-     - Temporary and permanent storage:  shelves 
-     - Sample and detector handling: BYO 
-     - Jigs, fixtures, scaffolds, etc. necessary  BYO 
-     - E & O activities: Space for new projects, student hands on experience 
-  - Occupancy: 
-     - Steady: 0 
-     - Peak: 4 
-  - Adjacencies (list/distance): 
-  - Space size (gsf and/or WxLxH): 8' x 6' 
-  - Experiment Systems: 
-  - Shielding: BYO 
-  - Floor load (PSF):  std minimal Cu shielding 
-  - Material handling (cranes, etc.) overhead crane reaches it 
-  - Finishes (walls/floor/ceiling): 
-  - Casework: 
-  - Storage: 
-  - Furniture/Fixtures/Equipment (non-experiment): table, computer, cart 
-  - Mechanical: 
-     - Environmental conditions: 
-     - Clean class: 
-     - Ventilation: 
-     - Exhaust: 
-     - Plumbing (domestic, waste, systems): 
-     - Fire Suppression: 
-     - Building Management System: 
-     - Fume hoods: 
-     - Chilled water 
-     - Other:  
-  - Electrical: 
-     - Power (clean and dirty): 
-     - Lighting: 
-     - Low Voltage/Data/Communication:  
-     - Fire Detection/Alarm: 
-     - Other:  
-  - Acoustical: 
-  - Vibration Isolation: 
-  - EMI/RFI Isolation: 
-  - Hazardous materials: 
-  - Special Consideration (expansion, etc.): 
  
faarm/newscreeni.1257424329.txt.gz · Last modified: 2009/11/05 06:32 by prisca