Campuses:
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| faarm:shallowi [2009/11/02 12:04] – meidm | faarm:shallowi [2009/12/22 13:06] (current) – removed ben | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | ====== Services at 800 level ====== | ||
| - | |||
| - | |||
| - | - Description/ | ||
| - | - Planned use (be specific): Materials storage | ||
| - | - Primary function: Material storage at the 800-ft level | ||
| - | - Temporary and permanent storage: both CR quality space and “drift” space Lunch space | ||
| - | - Sample and detector handling: • Drift space (i.e. just space with no cleanliness requirements): | ||
| - | o No related infrastructure beyond what’s in the drift. | ||
| - | o W x L x H = 10 m x 5 m x 3 m: (WAG) dimensions are not critical | ||
| - | • Drift space (i.e. just space with no cleanliness requirement): | ||
| - | o Enclosed space to control moisture (Want to minimize oxidation of Pb bricks) | ||
| - | o W x L x H = 5 m x 3 m x 3 m: (WAG) dimensions are not critical | ||
| - | • Clean Storage space: This is storage for items of intermittent need in the laboratories, | ||
| - | o Building structure | ||
| - | o W x L x H = 5 m x 2 m x 3 m: (WAG) dimensions not critical | ||
| - | o Class 2000 (WAG) | ||
| - | o Power 1 kW (WAG) | ||
| - | o Lights | ||
| - | o Air conditioning | ||
| - | • Lunch Space: Somewhere nearby the laboratory | ||
| - | o Building structure or somewhat relaxing mining environment (i.e. where one can remove PPE safely | ||
| - | o W x L x H = 5 m x 3 m x 3 m: (WAG) dimensions not critical | ||
| - | |||
| - | - Jigs, fixtures, scaffolds, etc. necessary: | ||
| - | - E & O activities | ||
| - | - Occupancy: | ||
| - | - Steady: | ||
| - | - Peak: | ||
| - | - Adjacencies (list/ | ||
| - | - Space size (gsf and/or WxLxH): | ||
| - | - Experiment Systems: | ||
| - | - Shielding: | ||
| - | - Floor load (PSF): | ||
| - | - Material handling (cranes, etc.) | ||
| - | - Finishes (walls/ | ||
| - | - Casework: | ||
| - | - Storage: | ||
| - | - Furniture/ | ||
| - | - Mechanical: | ||
| - | - Environmental conditions: | ||
| - | - Clean class: | ||
| - | - Ventilation: | ||
| - | - Exhaust: | ||
| - | - Plumbing (domestic, waste, systems): | ||
| - | - Fire Suppression: | ||
| - | - Building Management System: | ||
| - | - Fume hoods: | ||
| - | - Chilled water | ||
| - | - Other: | ||
| - | - Electrical: | ||
| - | - Power (clean and dirty): | ||
| - | - Lighting: | ||
| - | - Low Voltage/ | ||
| - | - Fire Detection/ | ||
| - | - Other: | ||
| - | - Acoustical: | ||
| - | - Vibration Isolation: | ||
| - | - EMI/RFI Isolation: | ||
| - | - Hazardous materials: | ||
| - | - Special Consideration (expansion, etc.): | ||