Go to the U of M home page
School of Physics & Astronomy
Assay and Acquisition of Radiopure Materials

User Tools


faarm:storei

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

faarm:storei [2009/09/24 11:26] – created priscafaarm:storei [2009/09/28 12:25] (current) meidm
Line 2: Line 2:
  
  
-  - Description/Name: +  - Description/Name: Material Acquisition and Storage at the 800-ft level 
-  - Planned use (be specific): +  - Planned use (be specific): Produce pure materials and storage materials 
-     - Primary function: +     - Primary function: Production and storage 
-     - Temporary and permanent storage: +     - Temporary and permanent storage: Both 
-     - Sample and detector handling:+     - Sample and detector handling: 
      - Jigs, fixtures, scaffolds, etc. necessary       - Jigs, fixtures, scaffolds, etc. necessary 
-     - E & O activities +     - E & O activities: Daily or weekly
   - Occupancy:   - Occupancy:
-     - Steady: +     - Steady: copper, lead, parts, and cables for 100 tons 
-     - Peak:+     - Peak: 1000 tons
   - Adjacencies (list/distance):   - Adjacencies (list/distance):
-  - Space size (gsf and/or WxLxH):+  - Space size (gsf and/or WxLxH): two rooms for 6m x 20 m x 3 m 
   - Experiment Systems:   - Experiment Systems:
   - Shielding:   - Shielding:
-  - Floor load (PSF): +  - Floor load (PSF): 2000g/cm2 
-  - Material handling (cranes, etc.) +  - Material handling (cranes, etc.) two cranes 
-  - Finishes (walls/floor/ceiling):+  - Finishes (walls/floor/ceiling): 2000g/cm2
   - Casework:   - Casework:
   - Storage:   - Storage:
-  - Furniture/Fixtures/Equipment (non-experiment):+  - Furniture/Fixtures/Equipment (non-experiment): Crane for moving materials in/out
   - Mechanical:   - Mechanical:
-     - Environmental conditions: +     - Environmental conditions: Temperature and humility control,  and radon reduced air 
-     - Clean class: +     - Clean class: 10,000 
-     - Ventilation: +     - Ventilation: 100 cfm 
-     - Exhaust: +     - Exhaust: 100 cfm 
-     - Plumbing (domestic, waste, systems):+     - Plumbing (domestic, waste, systems): water supply for assay materials
      - Fire Suppression:      - Fire Suppression:
      - Building Management System:      - Building Management System:
Line 34: Line 34:
      - Other:       - Other: 
   - Electrical:   - Electrical:
-     - Power (clean and dirty):+     - Power (clean and dirty): clean
      - Lighting:      - Lighting:
      - Low Voltage/Data/Communication:       - Low Voltage/Data/Communication: 
Line 42: Line 42:
   - Vibration Isolation:   - Vibration Isolation:
   - EMI/RFI Isolation:   - EMI/RFI Isolation:
-  - Hazardous materials:+  - Hazardous materials: General waste disposal: 1  hazardous chemical disposal: 1 lead contaminated ppe disposal: OSHA compliant layout
   - Special Consideration (expansion, etc.):   - Special Consideration (expansion, etc.):
  
faarm/storei.1253809583.txt.gz · Last modified: 2009/09/24 11:26 by prisca