Campuses:
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
faarm [2009/11/16 04:08] – prisca | faarm [2009/12/22 12:42] (current) – ben | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== Filling in the Infrastructure Requirements ====== | ||
- | |||
- | * [[faarm: | ||
- | * [[faarm: | ||
- | * {{: | ||
- | * {{: | ||
- | * [[faarm: | ||
- | * [[faarm: | ||
- | * [[faarm: | ||
- | * [[faarm: | ||
- | * [[faarm: | ||
- | * [[faarm: | ||
- | * [[faarm: | ||
- | * [[faarm: | ||
- | * [[faarm: | ||
- | * [[faarm: | ||
- | * [[faarm: | ||
- | * [[faarm: | ||
- | * [[faarm: | ||
- | |||
- | |||
- | Possible new WBS Structure | ||
- | - 4850 Facility (all items inside are class 2000) | ||
- | - Clean Facility Requirements | ||
- | - Water Shield | ||
- | - Immersion Tank (inside shield) | ||
- | - Gamma Counting (inside shield) | ||
- | - Alpha Counting (inside shield) | ||
- | - Beta Counting | ||
- | - R&D Space (inside shield) | ||
- | - Clean Machine Shop | ||
- | - Common clean storage and assembly space | ||
- | - Office Space | ||
- | - Wet chemistry | ||
- | - Bio Sample & Storage | ||
- | - 4850 Shared Infrastructure | ||
- | - Water Purification | ||
- | - Cryogens (purification, | ||
- | - Electroforming | ||
- | - 800 Facility & Infrastructure | ||
- | - Solid Materials Storage | ||
- | - Screeners | ||
- | - Surface Facility & Infrastructure | ||
- | - NAA radiochemistry | ||
- | - Screeners | ||
- | - Clean Machine Shop | ||
- | - ICPMS & Characterization (ion beam, other mass spec) | ||
- | - Laser isotope separation | ||
- | - Design conventional facilities (Petersen, Hulne, Holland) | ||
- | - Develop conventional facilities WBS (and integrate with overall WBS) | ||
- | - Develop facility program and design criteria | ||
- | - Develop conceptual design of surface and underground facilities | ||
- | - Address critical requirements | ||
- | - Develop design and construction schedules | ||
- | - Develop cost estimates for WBS items | ||
- | - Prepare Conceptual Design Report | ||
- | - Characterization and Monitoring | ||
- | - radon + mitigation plan | ||
- | - cavern radioactivity | ||
- | - cosmogenic activity | ||
- | - Integration | ||
- | - collaboration meetings | ||
- | - synergistic activities | ||
- | - E&O | ||
- | |||
- | |||