Campuses:
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| faarm [2009/11/16 04:13] – prisca | faarm [2009/12/22 12:42] (current) – ben | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | ====== Filling in the Infrastructure Requirements ====== | ||
| - | |||
| - | * [[faarm: | ||
| - | * [[faarm: | ||
| - | * {{: | ||
| - | * [[faarm: | ||
| - | * [[faarm: | ||
| - | * [[faarm: | ||
| - | * [[faarm: | ||
| - | * [[faarm: | ||
| - | * [[faarm: | ||
| - | * [[faarm: | ||
| - | * [[faarm: | ||
| - | * [[faarm: | ||
| - | * [[faarm: | ||
| - | * [[faarm: | ||
| - | * [[faarm: | ||
| - | * [[faarm: | ||
| - | |||
| - | |||
| - | Possible new WBS Structure | ||
| - | - 4850 Facility (all items inside are class 2000) | ||
| - | - Clean Facility Requirements | ||
| - | - Water Shield | ||
| - | - Immersion Tank (inside shield) | ||
| - | - Gamma Counting (inside shield) | ||
| - | - Alpha Counting (inside shield) | ||
| - | - Beta Counting | ||
| - | - R&D Space (inside shield) | ||
| - | - Clean Machine Shop | ||
| - | - Common clean storage and assembly space | ||
| - | - Office Space | ||
| - | - Wet chemistry | ||
| - | - Bio Sample & Storage | ||
| - | - 4850 Shared Infrastructure | ||
| - | - Water Purification | ||
| - | - Cryogens (purification, | ||
| - | - Electroforming | ||
| - | - 800 Facility & Infrastructure | ||
| - | - Solid Materials Storage | ||
| - | - Screeners | ||
| - | - Surface Facility & Infrastructure | ||
| - | - NAA radiochemistry | ||
| - | - Screeners | ||
| - | - Clean Machine Shop | ||
| - | - ICPMS & Characterization (ion beam, other mass spec) | ||
| - | - Laser isotope separation | ||
| - | - Design conventional facilities (Petersen, Hulne, Holland) | ||
| - | - Develop conventional facilities WBS (and integrate with overall WBS) | ||
| - | - Develop facility program and design criteria | ||
| - | - Develop conceptual design of surface and underground facilities | ||
| - | - Address critical requirements | ||
| - | - Develop design and construction schedules | ||
| - | - Develop cost estimates for WBS items | ||
| - | - Prepare Conceptual Design Report | ||
| - | - Characterization and Monitoring | ||
| - | - radon + mitigation plan | ||
| - | - cavern radioactivity | ||
| - | - cosmogenic activity | ||
| - | - Integration | ||
| - | - collaboration meetings | ||
| - | - synergistic activities | ||
| - | - E&O | ||
| - | |||
| - | |||