Go to the U of M home page
School of Physics & Astronomy
Assay and Acquisition of Radiopure Materials

User Tools


gammai:gamma_counting_stations

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
gammai:gamma_counting_stations [2009/09/24 10:56] priscagammai:gamma_counting_stations [2009/09/24 11:00] (current) prisca
Line 5: Line 5:
   - Planned use (be specific):   - Planned use (be specific):
      - Primary function:      - Primary function:
-b. Temporary and permanent storage: +     Temporary and permanent storage: 
-c. Sample and detector handling: +     - Sample and detector handling: 
-d. Jigs, fixtures, scaffolds, etc. necessary  +     - Jigs, fixtures, scaffolds, etc. necessary  
-e. E & O activities  +     - E & O activities  
-3. Occupancy: +  Occupancy: 
-a. Steady: +     - Steady: 
-b. Peak: +     - Peak: 
-4. Adjacencies (list/distance): +  Adjacencies (list/distance): 
-5. Space size (gsf and/or WxLxH): +  Space size (gsf and/or WxLxH): 
-6. Experiment Systems: +  Experiment Systems: 
-7. Shielding: +  Shielding: 
-8. Floor load (PSF): +  Floor load (PSF): 
-9. Material handling (cranes, etc.) +  Material handling (cranes, etc.) 
-10. Finishes (walls/floor/ceiling): +  Finishes (walls/floor/ceiling): 
-11. Casework: +  Casework: 
-12. Storage: +  Storage: 
-13. Furniture/Fixtures/Equipment (non-experiment): +  Furniture/Fixtures/Equipment (non-experiment): 
-14. Mechanical: +  Mechanical: 
-a. Environmental conditions: +     - Environmental conditions: 
-b. Clean class: +     - Clean class: 
-c. Ventilation: +     - Ventilation: 
-d. Exhaust: +     - Exhaust: 
-e. Plumbing (domestic, waste, systems): +     - Plumbing (domestic, waste, systems): 
-f. Fire Suppression: +     - Fire Suppression: 
-g. Building Management System: +     - Building Management System: 
-h. Fume hoods: +     - Fume hoods: 
-i. Chilled water +     - Chilled water 
-j. Other:  +     - Other:  
-15. Electrical: +  Electrical: 
-a. Power (clean and dirty): +     - Power (clean and dirty): 
-b. Lighting: +     - Lighting: 
-c. Low Voltage/Data/Communication:  +     - Low Voltage/Data/Communication:  
-d. Fire Detection/Alarm: +     - Fire Detection/Alarm: 
-e. Other:  +     - Other:  
-16. Acoustical: +  Acoustical: 
-17. Vibration Isolation: +  Vibration Isolation: 
-18. EMI/RFI Isolation: +  EMI/RFI Isolation: 
-19. Hazardous materials: +  Hazardous materials: 
-20. Special Consideration (expansion, etc.):+  Special Consideration (expansion, etc.):
  
gammai/gamma_counting_stations.1253807794.txt.gz · Last modified: 2009/09/24 10:56 by prisca