Campuses:
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| meeting4:postedtalks [2011/11/11 15:11] – 69.54.33.197 | meeting4:postedtalks [2011/11/12 18:18] (current) – 209.74.68.129 | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | === Friday === | + | === Friday |
| 8:30 Welcome {{: | 8:30 Welcome {{: | ||
| == Updates from the Main Simulation Packages == | == Updates from the Main Simulation Packages == | ||
| Line 18: | Line 19: | ||
| == Talks from Participants == | == Talks from Participants == | ||
| * 11:40 {{: | * 11:40 {{: | ||
| - | * 12:05 {{: | + | * 12:05 {{: |
| LUNCH | LUNCH | ||
| Line 32: | Line 33: | ||
| == Working Group Meetings (breakout sessions | == Working Group Meetings (breakout sessions | ||
| * Cosmogenics (group leader: Vitaly Kudryavtsev) Muon-induced processes, underground benchmarking, | * Cosmogenics (group leader: Vitaly Kudryavtsev) Muon-induced processes, underground benchmarking, | ||
| - | * Radiogenics | + | * Radiogenics |
| * Framework (group leader: Mike Kelsey) Modular Sim structures, Validating, Collaboration models | * Framework (group leader: Mike Kelsey) Modular Sim structures, Validating, Collaboration models | ||
| Line 40: | Line 41: | ||
| * 9: | * 9: | ||
| + | * [[http:// | ||
| + | * {{: | ||
| + | * {{: | ||
| == Experimental Neutron Background Benchmarking == | == Experimental Neutron Background Benchmarking == | ||
| - | * 10:00 {{: | + | * 10:00 {{: |
| - | * 10:25 Large Liquid Scintillator Detector for neutrons (Chao Zhang) | + | * 10:25 {{: |
| Break (10:45 – 11:00) | Break (10:45 – 11:00) | ||
| - | * 11:00 Update on SURF screening plans (DongMing Mei) | + | * 11: |
| - | * 11:20 A Common Gen-3 Low Background Facility: FAARM (Lee Petersen) | + | * 11: |
| * 11:40 Discussion: Plans for upgrading US screening capability | * 11:40 Discussion: Plans for upgrading US screening capability | ||
| Line 57: | Line 61: | ||
| * 1:30-2:30 in two breakout rooms | * 1:30-2:30 in two breakout rooms | ||
| - | * Depth Working Group Meeting | + | * Depth Working Group Meeting |
| * Materials Database improvements and collaboration building | * Materials Database improvements and collaboration building | ||