Campuses:
This shows you the differences between two versions of the page.
Next revision | Previous revision | ||
newfaarm [2012/04/29 09:35] – created prisca | newfaarm [2012/06/24 17:31] (current) – prisca | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ==== FACILITY FOR ASSAY AND ACQUISITION OF RADIOPURE MATERIALS ==== | + | ===== FAARM: |
+ | ==== 2012 Engineering Plans for a Site-independent FAARM to fit in Homestake or Soudan ==== | ||
+ | === Overview === | ||
+ | Three-Dimensional Renderings of entire facility {{:: | ||
+ | Project Description (Lee Petersen){{:: | ||
+ | Project Participants are Itasca, CNA, Miller Dunwiddie, Dunham Associates.{{: | ||
+ | ** Budget **\\ | ||
+ | {{: | ||
+ | {{:: | ||
+ | ===Architectural Design === | ||
+ | * {{:: | ||
+ | * {{: | ||
+ | * {{: | ||
+ | === Acrylic Torus Engineering === | ||
+ | * {{:: | ||
+ | * Drawing sent to Manufacturer for cost estimate | ||
+ | * {{:: | ||
+ | * {{:: | ||
+ | === Electrical Systems === | ||
+ | * {{: | ||
+ | * {{: | ||
+ | |||
+ | === Mechanical (incl airflow) Systems === | ||
+ | * {{: | ||
+ | * {{: |