Campuses:
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| newfaarm [2012/05/04 16:37] – prisca | newfaarm [2012/06/24 17:31] (current) – prisca | ||
|---|---|---|---|
| Line 2: | Line 2: | ||
| ==== 2012 Engineering Plans for a Site-independent FAARM to fit in Homestake or Soudan ==== | ==== 2012 Engineering Plans for a Site-independent FAARM to fit in Homestake or Soudan ==== | ||
| === Overview === | === Overview === | ||
| - | Link to Lee Petersen' | + | Three-Dimensional Renderings of entire facility {{:: |
| - | Project Participants are Itasca, CNA, Miller Dunwiddie, Dunham Associates. Details | + | Project Description (Lee Petersen){{:: |
| + | Project Participants are Itasca, CNA, Miller Dunwiddie, Dunham Associates.{{: | ||
| + | ** Budget **\\ | ||
| + | {{: | ||
| + | {{:: | ||
| ===Architectural Design === | ===Architectural Design === | ||
| * {{:: | * {{:: | ||
| - | * {{: | + | * {{: |
| - | === Civil and Structural === | + | * {{: |
| - | * {{:faarm_pdr_electrical_drawings_2012-0504.pdf|Drawings}} | + | === Acrylic Torus Engineering |
| - | * {{:faarm_pdr_civil-structural_narrative_2012-0504.pdf|Narrative}} | + | * {{:: |
| + | | ||
| + | | ||
| + | * {{:: | ||
| === Electrical Systems === | === Electrical Systems === | ||
| - | * Drawings | + | * {{: |
| - | * Narrative | + | * {{: |
| === Mechanical (incl airflow) Systems === | === Mechanical (incl airflow) Systems === | ||
| + | * {{: | ||
| + | * {{: | ||
| + | |||