Campuses:
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
newfaarm [2012/05/04 16:37] – prisca | newfaarm [2012/06/24 17:31] (current) – prisca | ||
---|---|---|---|
Line 2: | Line 2: | ||
==== 2012 Engineering Plans for a Site-independent FAARM to fit in Homestake or Soudan ==== | ==== 2012 Engineering Plans for a Site-independent FAARM to fit in Homestake or Soudan ==== | ||
=== Overview === | === Overview === | ||
- | Link to Lee Petersen' | + | Three-Dimensional Renderings of entire facility {{:: |
- | Project Participants are Itasca, CNA, Miller Dunwiddie, Dunham Associates. Details | + | Project Description (Lee Petersen){{:: |
+ | Project Participants are Itasca, CNA, Miller Dunwiddie, Dunham Associates.{{: | ||
+ | ** Budget **\\ | ||
+ | {{: | ||
+ | {{:: | ||
===Architectural Design === | ===Architectural Design === | ||
* {{:: | * {{:: | ||
- | * {{: | + | * {{: |
- | === Civil and Structural === | + | * {{: |
- | * {{:faarm_pdr_electrical_drawings_2012-0504.pdf|Drawings}} | + | === Acrylic Torus Engineering |
- | * {{:faarm_pdr_civil-structural_narrative_2012-0504.pdf|Narrative}} | + | * {{:: |
+ | | ||
+ | | ||
+ | * {{:: | ||
=== Electrical Systems === | === Electrical Systems === | ||
- | * Drawings | + | * {{: |
- | * Narrative | + | * {{: |
=== Mechanical (incl airflow) Systems === | === Mechanical (incl airflow) Systems === | ||
+ | * {{: | ||
+ | * {{: | ||
+ |