Campuses:
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
nmm:lbcfmuons [2013/07/30 11:51] – koch | nmm:lbcfmuons [2013/11/26 17:14] (current) – villaa | ||
---|---|---|---|
Line 1: | Line 1: | ||
=====Muon Trigger Coincidence Timing===== | =====Muon Trigger Coincidence Timing===== | ||
- | The Soudan veto shield has been running for quite a long time now and it was recently realized that there is a problem with the correlation of times between different MUXes (front-end DAQ cards) and the NMM Symmetricom times. | + | The Soudan veto shield has been running for quite a long time now and it was recently realized that there is a problem with the correlation of times between different MUXes (front-end DAQ cards) and the NMM Symmetricom times. |
^Station^MUX^Delay from NMM (sec)^Delay from NMM (musec)^ | ^Station^MUX^Delay from NMM (sec)^Delay from NMM (musec)^ |