Please feel free to login (first time will create account) and edit your section. I have put a few placeholders to show how this might work. Immediate needs refers to jobs you would like done by the mine crew as soon as there is any access. I have already communicated the need for SOLO, Gopher, and CoGeNT to keep radon plateout to a minimum. | Please feel free to login (first time will create account) and edit your section. I have put a few placeholders to show how this might work. Immediate needs refers to jobs you would like done by the mine crew as soon as there is any access. I have already communicated the need for SOLO, Gopher, and CoGeNT to keep radon plateout to a minimum. | ||
+ | **update Monday, April 18 --** | ||
+ | Full Power was restored to the lab over the weekend. | ||
==== CoGeNT ==== | ==== CoGeNT ==== | ||
=== Immediate needs === | === Immediate needs === | ||
Line 20: | Line 22: | ||
Nitrogen purge for radon reduction (LN boiloff or N2 compressed gas) | Nitrogen purge for radon reduction (LN boiloff or N2 compressed gas) | ||
=== Plan for startup === | === Plan for startup === | ||
+ | * Require pictures of the area to show debris | ||
+ | * Determine if vacuum space requires repumping. Where is the vacuum port? Inside or outside of shield? | ||
+ | * If outside, definitely pump | ||
+ | * Proceed after lab has been cleaned | ||
+ | * Wipe down Mylar | ||
+ | * Restart LN, bias, take initial background spectrum | ||
+ | * If this is OK, proceed with regular operation | ||
+ | * If background shows contamination, | ||
+ | * Retake background spectrum | ||
+ | * If background still shows contamination, | ||
==== Gopher ==== | ==== Gopher ==== | ||
=== Immediate needs === | === Immediate needs === | ||
Line 31: | Line 43: | ||
==== Veto Shield ==== | ==== Veto Shield ==== | ||
=== Immediate needs === | === Immediate needs === | ||
+ | Make sure that the HV is all off while power is intermittant. | ||
+ | |||
We would like to have the 5 veto computers up and running as soon as possible, so we can continue our DAQ work. The question is when will the network be up, so we can use them remotely? | We would like to have the 5 veto computers up and running as soon as possible, so we can continue our DAQ work. The question is when will the network be up, so we can use them remotely? | ||
Line 48: | Line 62: | ||
=== Plan for startup === | === Plan for startup === | ||
==== Gravity Meter ==== | ==== Gravity Meter ==== | ||
- | If it is necessary to move the gravity meters then they should be clamped first. | + | === Immediate needs === |
- | === Immediate needs === | + | === Plan for startup === The start up has been accomplished |
- | Restart the two gravity meters and adjust the long and cross levels. | + | |
- | === Plan for startup === | + | ==== Update from Marvin Marshak (Saturday, April 16) ==== |
- | Whenever possible, I would like to bring the meter that is supported | + | |
- | ==== Update from Marvin Marshak (Friday, March 25) ==== | + | |
- | There was continued work in the shaft today and a brief entry into the Soudan | + | • Full electrical power was restored to the entire |
- | + | DNR staff and an outside electrical contractor installed a new power cable | |
- | * Today' | + | between |
- | + | all circuits in the lab were shut off. Following this check, power was turned | |
- | * The electrical cable between | + | on to the Lab substation |
- | + | and HVAC system in the Lab. These systems appear to function normally. | |
- | | + | The Lab closed loop cooling system also seems to function normally. |
- | + | The Lab fire detection system is also functioning and will shut down power | |
- | * All doors to the lab are now closed at the suggestion | + | to the lab, in the event of an alarm detection. |
- | + | ||
- | * The DNR and University staff have now worked continuously since last Thursday night. There will be no work this weekend, in order to rest the staff for next week. Work will resume | + | • The fiber optic cable has sufficient slack that it will be possible to cut out |
- | + | the damaged section | |
- | * Next report will be Monday. | + | be working next week. |
+ | |||
+ | • Representatives of cleaning companies will visit the lab on Monday to | ||
+ | prepare estimates for general clean up of the lab, including remnants | ||
+ | of the foam and the debris brought in by the foam. | ||
+ | |||
+ | • ECI, the contractor hired by the DNR to do shaft renovations, | ||
+ | key personnel on site this coming week, beginning with an on-site pre-construction | ||
+ | meeting on Monday. CNA Engineering has also been hired to provide | ||
+ | geo-technical advice to ECI. A CNA engineer | ||
+ | coming week. A likely arrangement beginning this coming week is that | ||
+ | lab and DNR access | ||
+ | at 6 am, with ECI shaft work on a second shift, possibly beginning at 2 pm. | ||
+ | |||
+ | • Work in the lab this coming week will focus on re-starting the MINOS | ||
+ | Detector, beginning with checks of control system electronics and work | ||
+ | to dry out the magnet cables. | ||
+ | |||
+ | • The sprinkler contractor has submitted drawings | ||
+ | Marshal for the repairs | ||
+ | and repair work is also expected to start this coming week. | ||
+ | |||
+ | • The University has hired CNA Engineering and Don Zeni, a specialized drilling | ||
+ | consultant, to evaluate the feasibility of providing an alternate | ||
+ | lab through either a ~6 inch diameter hole and/or a ~4 foot diameter hole. | ||
+ | A small hole would enable an independent path for communications, | ||
+ | high pressure air ventilation between the surface and the lab. The larger | ||
+ | hole would also enable a secondary, emergency egress, in addition to the telecom | ||
+ | and power connections. |