Go to the U of M home page
School of Physics & Astronomy
Assay and Acquisition of Radiopure Materials

User Tools


planning

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
planning [2011/04/18 14:58] – [Update from Marvin Marshak (Wednesday, March 30)] 128.101.214.140planning [2011/05/09 12:33] (current) – [Gravity Meter] 24.245.16.19
Line 6: Line 6:
  
 **update Monday, April 18  --**   **update Monday, April 18  --**  
-Full Power was restored to the lab over the weekend.  Cleaning crews and fiber optic cable splicing will occur through this week.+Full Power was restored to the lab over the weekend.  Cleaning crews and fiber optic cable splicing will occur through this week.  Computers will become available for remote access by the end of the week.  Currently expecting access may be as soon as mid-May, but we need to properly schedule visits, so we will being communicating directly with the experiments about their visits near the end of April.
 ==== CoGeNT ==== ==== CoGeNT ====
 === Immediate needs === === Immediate needs ===
Line 62: Line 62:
 === Plan for startup === === Plan for startup ===
 ==== Gravity Meter ==== ==== Gravity Meter ====
-=== Immediate needs === +=== Immediate needs ===  
-=== Plan for startup === +=== Plan for startup === The start up has been accomplished by Jerry Meier.  A replacement UPS power supply is being shipped to the Surface Building in Soudan for installation in the gravity meter setup. 
-When possible, the grounded meter should be restarted because the data collected at the Soudan Mine is better for showing an annual cycle in the baseline noise of gravity measurements.  If permitted then I am glad to come and do the start up.  If the start up can be done sooner by Jerry Meier then that is the preferred option because delays mean missing out on alignments.+