Campuses:
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
planning [2011/04/18 14:58] – [Update from Marvin Marshak (Wednesday, March 30)] 128.101.214.140 | planning [2011/05/09 12:33] (current) – [Gravity Meter] 24.245.16.19 | ||
---|---|---|---|
Line 6: | Line 6: | ||
**update Monday, April 18 --** | **update Monday, April 18 --** | ||
- | Full Power was restored to the lab over the weekend. | + | Full Power was restored to the lab over the weekend. |
==== CoGeNT ==== | ==== CoGeNT ==== | ||
=== Immediate needs === | === Immediate needs === | ||
Line 62: | Line 62: | ||
=== Plan for startup === | === Plan for startup === | ||
==== Gravity Meter ==== | ==== Gravity Meter ==== | ||
- | === Immediate needs === | + | === Immediate needs === |
- | === Plan for startup === | + | === Plan for startup === The start up has been accomplished |
- | When possible, the grounded meter should be restarted because the data collected at the Soudan Mine is better for showing an annual cycle in the baseline noise of gravity measurements. | + | |
==== Update from Marvin Marshak (Saturday, April 16) ==== | ==== Update from Marvin Marshak (Saturday, April 16) ==== | ||