 === Plan for startup === === Plan for startup ===
 ==== Gravity Meter ==== ==== Gravity Meter ====
-=== Immediate needs === +=== Immediate needs ===  
-=== Plan for startup === +=== Plan for startup === The start up has been accomplished by Jerry Meier.  A replacement UPS power supply is being shipped to the Surface Building in Soudan for installation in the gravity meter setup. 
-When possible, the grounded meter should be restarted because the data collected at the Soudan Mine is better for showing an annual cycle in the baseline noise of gravity measurements.  If permitted then I am glad to come and do the start up.  If the start up can be done sooner by Jerry Meier then that is the preferred option because delays mean missing out on alignments.+
 ==== Update from Marvin Marshak (Saturday, April 16) ==== ==== Update from Marvin Marshak (Saturday, April 16) ====
  