meetingsandtelecons:proposalworkplansteve20071015 [2007/10/17 20:39] – created 24.118.179.208meetingsandtelecons:proposalworkplansteve20071015 [2007/10/17 20:40] (current) 24.118.179.208
Line 20: Line 20:
  
 1.  - Define the needed measurement parameters to reach the goal of probing inflation at a specified level. Define the ancillary science that is possible with such an instrument. Two main mission templates should be considered: a 1 degree resolution mission and a 4 arcminute resolution mission. 1.  - Define the needed measurement parameters to reach the goal of probing inflation at a specified level. Define the ancillary science that is possible with such an instrument. Two main mission templates should be considered: a 1 degree resolution mission and a 4 arcminute resolution mission.
 +
 2.  - Explore the instrument, spacecraft, and scan requirements for reaching the measurement parameters above. 2.  - Explore the instrument, spacecraft, and scan requirements for reaching the measurement parameters above.
 +
 3.  - Assemble the known detector and instrument technologies relevant to 1 and 2 above. Determine the TRL level of these technologies. Determine the schedule and cost to bring two (probably a 1 degree and a 4 arcminute) template missions to the point where a mission could be proposed. 3.  - Assemble the known detector and instrument technologies relevant to 1 and 2 above. Determine the TRL level of these technologies. Determine the schedule and cost to bring two (probably a 1 degree and a 4 arcminute) template missions to the point where a mission could be proposed.
  
Line 28: Line 30:
  
 1. - Three public Workshops as described below 1. - Three public Workshops as described below
 +
 2. - Several detailed studies. This includes, but is not limited to, the required costing studies. 2. - Several detailed studies. This includes, but is not limited to, the required costing studies.
 +
 3. - One final writing workshop in late October 2008 followed by a report writing exercise. 3. - One final writing workshop in late October 2008 followed by a report writing exercise.
  
Line 36: Line 40:
  
 1.  - Theory and ancillary science 1.  - Theory and ancillary science
 +
 2.  - Foregrounds, systematic errors and observing strategies 2.  - Foregrounds, systematic errors and observing strategies
 +
 3.  - Technology definition and costs 3.  - Technology definition and costs
  
meetingsandtelecons/proposalworkplansteve20071015.1192671557.txt.gz · Last modified: 2007/10/17 20:39 by 24.118.179.208