1. - Define the needed measurement parameters to reach the goal of probing inflation at a specified level. Define the ancillary science that is possible with such an instrument. Two main mission templates should be considered: a 1 degree resolution mission and a 4 arcminute resolution mission. | 1. - Define the needed measurement parameters to reach the goal of probing inflation at a specified level. Define the ancillary science that is possible with such an instrument. Two main mission templates should be considered: a 1 degree resolution mission and a 4 arcminute resolution mission. | ||
+ | |||
2. - Explore the instrument, spacecraft, and scan requirements for reaching the measurement parameters above. | 2. - Explore the instrument, spacecraft, and scan requirements for reaching the measurement parameters above. | ||
+ | |||
3. - Assemble the known detector and instrument technologies relevant to 1 and 2 above. Determine the TRL level of these technologies. Determine the schedule and cost to bring two (probably a 1 degree and a 4 arcminute) template missions to the point where a mission could be proposed. | 3. - Assemble the known detector and instrument technologies relevant to 1 and 2 above. Determine the TRL level of these technologies. Determine the schedule and cost to bring two (probably a 1 degree and a 4 arcminute) template missions to the point where a mission could be proposed. | ||
Line 28: | Line 30: | ||
1. - Three public Workshops as described below | 1. - Three public Workshops as described below | ||
+ | |||
2. - Several detailed studies. This includes, but is not limited to, the required costing studies. | 2. - Several detailed studies. This includes, but is not limited to, the required costing studies. | ||
+ | |||
3. - One final writing workshop in late October 2008 followed by a report writing exercise. | 3. - One final writing workshop in late October 2008 followed by a report writing exercise. | ||
Line 36: | Line 40: | ||
1. - Theory and ancillary science | 1. - Theory and ancillary science | ||
+ | |||
2. - Foregrounds, | 2. - Foregrounds, | ||
+ | |||
3. - Technology definition and costs | 3. - Technology definition and costs | ||