4850 level, room at the WYE, train passes by but otherwise a very quiet environment. Also used to store our foam panels, there should be 12-15 complete panels and several smaller pieces.
Status: tile installed, huts built. Need to finish network/power installations, need to define a place for electronics.
Install sheet: 4850c.pdf
| Q330 serial | 01000006FB36BC6B |
| Q330 tag | 443 |
| Q330 IP | 204.114.29.38 |
| Sensor type | STS-2 |
| Sensor serial | 20045 |
| Baler tag | 05195 |
| GPS transceiver serial | DY5A10128 |
| Switch label | 4850 SW 1 |
| Date | Comments | Update by |
|---|---|---|
| 11/19/2014 | Tanner installed the full station. Still need a cable for GPS timing. | Tanner |
| 11/20/2014 | GPS cable installed. Timing quality at 80%, not improving. | Tanner |
| 01/15/2015 | Moved electronics out of insulation hut and onto a table. Installed a new GPS cable with TTL to RS-232 conversion, timing quality at 100%. Replaced DC power supply with a batter and battery tender. | Tanner |
| 02/02/2015 | Seismometer mass positions checked remotely, centering not needed. | Tanner |
| 04/02/2015 | Used the Octans to align the seismometer. The seismometer was centered after the alignment. | Tanner |