4850 level, in Davis campus, people pass by on the way to the labs but otherwise a very quiet environment.
Status: tile installed, huts built, power and network should already be installed. Need to define a place for electronics.
Install sheet: 4850d.pdf
| Q330 serial | 010000044D895EDB |
| Q330 tag | 809 |
| Q330 IP | 204.114.29.39 |
| Sensor type | STS-2 |
| Sensor serial | 80403 |
| Baler tag | 05410 |
| GPS transceiver serial | DY5A10106 |
| Switch label | 4850 SW 1 |
| Date | Comments | Update by |
|---|---|---|
| 11/19/2014 | Tanner installed the full station. Still need a cable for GPS timing. | Tanner |
| 11/20/2014 | GPS cable installed. Timing quality at 80%, not improving. | Tanner |
| 01/15/2015 | Moved electronics out of insulation hut and onto a table. Installed a new GPS cable with TTL to RS-232 conversion, timing quality at 100%. | Tanner |
| 02/02/2015 | Centered the seismometer remotely. | Tanner |
| 04/02/2015 | Used the Octans to align the seismometer. The seismometer was centered after the alignment. | Tanner |