Campuses:
This is an old revision of the document!
Surface site near the Lead Highschool.
Status: Installed concrete pad, retaining wall, insulation. The solar panel is not needed at this location since we are planning to use the nearby AC plug. Network will likely go via the school network. Need to define a place for electronics.