Campuses:
This is an old revision of the document!
Surface site at Oro Hondo. On Lab property, but need permission from Barrick to access it.
Status: Installed concrete pad, retaining wall, insulation, and the solar panel post. Need to install the solar panel, radio, define a place for electronics.
Install sheet: oro.pdf