Homestake meeting minutes, 07/24/2014 | Homestake meeting minutes, 07/24/2014 | ||
- | Attending: | + | Attending: |
Homestake wiki: https:// | Homestake wiki: https:// | ||
Line 8: | Line 8: | ||
1) Homestake update | 1) Homestake update | ||
- | - Surface stations (Gary) | ||
- | - Next visit (Vuk, Victor) | ||
- | 2) UMN test setup (Tanner) | + | * Next visit |
+ | |||
+ | Vuk: Victor and Vuk going to Homestake 07/28-29 to finalize locations of seismometers, | ||
+ | |||
+ | * Surface stations | ||
+ | |||
+ | Gary: summarized latest visit to Homestake to scout possible surface locations. | ||
+ | |||
+ | OHS: good location, maybe not bedrock, also could here the ventilation. Telemetry to Ross or Yates is possible. Lab property, road ploughed in the winter. | ||
+ | |||
+ | WTP: standing on bedrock, but there are people and machinery nearby. Telemetry to Yates could be possible. | ||
+ | |||
+ | RRDG: great site but on Barrick property so we need a permit. There is a road to it, ploughed at least most of the way, would need their permit and key for access. Large drop to the open pit nearby. Telemetry possible. Probably very windy, will have to be careful with the solar panel etc. | ||
+ | |||
+ | LHS: near a highschool, gives aperture in the opposite direction from other locations (west). School enthusiastic to help us out. Could be noisy, but supports outreach. Maybe meet with classes as part of the preparation, | ||
+ | |||
+ | Yates: ridge near the entrance gate, somewhat away from Yates machinery. Could use solar, telemetry to Yates. | ||
+ | |||
+ | Ross: a couple of locations that could have telemetry to Yates. Ridge line passing through there. | ||
+ | |||
+ | Both Ross and yates locations should be decoupled from GPS and master digitizers. | ||
+ | |||
+ | ALso looked at 3 regions further out, to increase aperture. Private ownership, should be able to find someone to allow us to build stations. No telemetry, will have to harvest periodically. Summer/ | ||
+ | |||
+ | |||
+ | |||
+ | 2) UMN test setup | ||
+ | |||
+ | Tanner: returned the Liteway equipment. | ||
+ | |||
+ | Vuk: finalized the design of transceivers for the GPS distribution system, will use single-mode fibers driven by lasers. In our test setup, we tested the option with multimode fibers driven by LEDs. Hope to make an order for the transceivers and optical fibers in a week or two. | ||
3) Analysis of existing data | 3) Analysis of existing data | ||
- | - Estimation algorithms (Shivaraj, Eric, Noah) | + | - Estimation algorithms (Shivaraj, Eric, Noah) - no news |
+ | |||
+ | Next meeting: Aug 7 | ||