Campuses:
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
groups:homestake:meetings:20140724 [2014/07/24 11:57] – mandic | groups:homestake:meetings:20140724 [2014/07/24 13:11] (current) – mandic | ||
---|---|---|---|
Line 9: | Line 9: | ||
1) Homestake update | 1) Homestake update | ||
- | - Next visit | + | * Next visit |
- | Vuk: Victor and Vuk going to Homestake 07/28-29 to finalize locations of seismometers, | + | Vuk: Victor and Vuk going to Homestake 07/28-29 to finalize locations of seismometers, |
+ | * Surface stations | ||
- | - Surface stations (Gary) | ||
Gary: summarized latest visit to Homestake to scout possible surface locations. | Gary: summarized latest visit to Homestake to scout possible surface locations. | ||
Line 35: | Line 35: | ||
- | 2) UMN test setup (Tanner) | + | 2) UMN test setup |
+ | |||
+ | Tanner: returned the Liteway equipment. | ||
+ | |||
+ | Vuk: finalized the design of transceivers for the GPS distribution system, will use single-mode fibers driven by lasers. In our test setup, we tested the option with multimode fibers driven by LEDs. Hope to make an order for the transceivers and optical fibers in a week or two. | ||
3) Analysis of existing data | 3) Analysis of existing data | ||
- | - Estimation algorithms (Shivaraj, Eric, Noah) | + | - Estimation algorithms (Shivaraj, Eric, Noah) - no news |
+ | |||
+ | Next meeting: Aug 7 | ||