Campuses:
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
groups:homestake:meetings:20140807 [2014/08/07 10:37] – mandic | groups:homestake:meetings:20140807 [2014/08/07 11:36] (current) – mandic | ||
---|---|---|---|
Line 1: | Line 1: | ||
Homestake Telecon Minutes, 08/07/14 | Homestake Telecon Minutes, 08/07/14 | ||
- | Attending: | + | Attending: |
Homestake wiki: https:// | Homestake wiki: https:// | ||
Line 7: | Line 7: | ||
Our agenda: | Our agenda: | ||
- | 1) Homestake update (Vuk, Victor) | + | 1) Homestake update (Vuk, Victor): Vuk presented the status of underground locations at Homestake, the design of the GPS distribution system, and the plans for fiber layout near the shaft and at the stations. See the pdf's below |
- status of underground locations at Homestake: {{groups: | - status of underground locations at Homestake: {{groups: | ||
- GPS distribution system: {{groups: | - GPS distribution system: {{groups: | ||
- network system and power considerations: | - network system and power considerations: | ||
- | 2) UMN test setup (Tanner) | + | 2) UMN test setup (Tanner): no news |
3) Analysis of existing data | 3) Analysis of existing data | ||
- | - Estimation algorithms (Shivaraj, Eric, Noah): {{groups: | + | - Noah modified the simulation and the recovery codes to handle S-waves. He conducted a sequence of tests: {{groups: |