Campuses:
This is an old revision of the document!
Homestake Meeting Minutes, 11/13/14
Attending: Daniel, Vuk, Riccardo, Tanner, Pat
Homestake wiki: https://zzz.physics.umn.edu/groups/homestake/home
Our agenda:
1) Homestake: planning the next trip
Vuk: PASSCAL shipment should be there. Purchased 5 sealed batteries for the surface stations, and two 12V 1.25 Amp batteries with smart chargers for two underground stations. The third underground station should be powered with a DC power supply. Tanner and Pat will bring these from MSP, pick up Gary from Rapid airport, and pick up the doghouses from the Tractor Supply store in Rapid.
On Monday will have to open crates at the Ross Warehouse and check the equipment. Also install the radio on the roof of Yates admin building and the GPR transceiver in the IT room. Will need Jamey for this.
On Tuesday, Gary and Pat can start installing surface stations, and Tanner and Jamey can install the three stations at 4850. The remaining days will be used to complete the surface stations and set up the data flow.
2) UMN test setup (Tanner)
3) Analysis of existing data