Campuses:
This shows you the differences between two versions of the page.
Next revision | Previous revision | ||
groups:homestake:meetings:20150108 [2015/01/08 09:00] – created mandic | groups:homestake:meetings:20150108 [2015/01/08 10:53] (current) – mandic | ||
---|---|---|---|
Line 1: | Line 1: | ||
Homestake meeting minutes, 01/08/15 | Homestake meeting minutes, 01/08/15 | ||
- | Attending: | + | Attending: |
Homestake wiki: https:// | Homestake wiki: https:// | ||
1) Homestake status | 1) Homestake status | ||
- | - duty cycle of existing stations? | ||
- | - any changes in timing? | ||
- | - antelope setup | ||
- | Tanner (via email): The stations seem to be receiving the GPS time consistently (the last reset was 19 days ago) but we still have the timing issues. | + | Tanner (via email): The stations seem to be receiving the GPS time consistently (the last reset was 19 days ago) but we still have the timing issues. |
- | + | ||
- | I have built parts of 14 more cables for running from the digitizers to the GPS transceivers, | + | |
Vuk will be bringing an attenuator to place upstream of the first transceiver. If this does not solve the GPS locking problem, have additional connectors/ | Vuk will be bringing an attenuator to place upstream of the first transceiver. If this does not solve the GPS locking problem, have additional connectors/ | ||
+ | |||
+ | Gary still receiving the data online. Rock solid, surface machine pushing data to Indiana. Every few hours there is a glitch when the digitizer re-synchronizes. Can adjust it to send the data to UMN, and UMN can serve as distributor to others. Every times the digitizer synchronizes there is 0.25sec data gap and then a single sample spike. Will follow up with IRIS to understand better. | ||
+ | |||
+ | Daniel also working on the antelope, getting close to setting it up. | ||
2) Planning next visit: Jan 12 - 23. Tanner and Daniel will stay the entire period, Vuk will join 01/11-16, Gary will join 01/18-23. To do list: | 2) Planning next visit: Jan 12 - 23. Tanner and Daniel will stay the entire period, Vuk will join 01/11-16, Gary will join 01/18-23. To do list: | ||
Line 26: | Line 25: | ||
* 4100-1: power/ | * 4100-1: power/ | ||
* 4100-A: power/ | * 4100-A: power/ | ||
- | * 4850-2,3,4: move electronics outside of the enclosure. | + | * 4850-2,3,4: move electronics outside of the enclosure. For 4850-B there is a large east-west signal, not sure where it is coming from - should check. |
* Troubleshoot the problem with radio’s, reconfigure the admin building antenna and the two field antennae (Yates and Ross). | * Troubleshoot the problem with radio’s, reconfigure the admin building antenna and the two field antennae (Yates and Ross). | ||
* If weather allows, install other surface stations. | * If weather allows, install other surface stations. | ||
Line 33: | Line 32: | ||
* Enable access to the master Q330. | * Enable access to the master Q330. | ||
* Connect the old surface machine to the internet, maybe use it as local data storage. Or else ship it back to UMN. | * Connect the old surface machine to the internet, maybe use it as local data storage. Or else ship it back to UMN. | ||
+ | * Set up antelope: send data to UMN, then from there to Indiana and Caltech. | ||
Vuk has found several vendors of batteries and smart chargers in Rapid City, plan to purchase them there (need a 12V, 12A, gel cell battery and a 12V, 1-1.5A charger at each underground station). | Vuk has found several vendors of batteries and smart chargers in Rapid City, plan to purchase them there (need a 12V, 12A, gel cell battery and a 12V, 1-1.5A charger at each underground station). | ||
+ | |||
+ | Daniel: could try to do a huddle test underground at the 4100-A station? | ||
+ | |||
+ | Vuk: good idea, should have enough digitizers and transceivers to do it. Let's revisit this and plan it more carefully when we meet at Homestake and sort out some of the other problems (like the GPS). | ||
3) Analysis of existing data | 3) Analysis of existing data | ||
- Estimation algorithms (Shivaraj, Eric, Noah) | - Estimation algorithms (Shivaraj, Eric, Noah) | ||
+ | |||
+ | Gary: found radar topography data at 30m resolution. Will be an important resource in the analysis, to give geometry insight. Couldn' | ||
+ | |||
+ | Gary: also need a place to keep information about all stations. Propose to use Dropbox. | ||
+ | |||
+ | Vuk: fine with dropbox, but would also like to have a more permanent record of it, maybe using svn. will show our svn to Gary, can decide afterwards how to set things up. | ||
+ | |||
+ | |||
+ | |||