Campuses:
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
groups:homestake:meetings:20150305 [2015/03/05 10:14] – mandic | groups:homestake:meetings:20150305 [2015/03/05 16:42] (current) – mandic | ||
---|---|---|---|
Line 1: | Line 1: | ||
Homestake meeting minutes, 03/05/15 | Homestake meeting minutes, 03/05/15 | ||
- | Attending: Victor, Tanner, Noah, Vuk, Daniel | + | Attending: Victor, Tanner, Noah, Vuk, Daniel, Pat |
Homestake wiki: https:// | Homestake wiki: https:// | ||
Line 9: | Line 9: | ||
1) Homestake status (Tanner, Gary, Daniel) | 1) Homestake status (Tanner, Gary, Daniel) | ||
* stations duty cycle: Tanner hasn't seen any interruptions in the data flow. A few weeks ago there was a strange issue: mass positions for 4100D for two days got lumped into one day file. Will have to deal with this scenario in the code that makes frames, working on implementing this. Added data quality from the surface Q330, so that we can check the clock quality there for diagnostic purposes later. | * stations duty cycle: Tanner hasn't seen any interruptions in the data flow. A few weeks ago there was a strange issue: mass positions for 4100D for two days got lumped into one day file. Will have to deal with this scenario in the code that makes frames, working on implementing this. Added data quality from the surface Q330, so that we can check the clock quality there for diagnostic purposes later. | ||
- | * data flow: Daniel: data coming in, trying to convert antelope files into a different format for analysis. Tanner: data is being forwarded to IRIS, started last week. Victor: there may be something wrong with the instrument response information, | + | * data flow: Daniel: data coming in, trying to convert antelope files into a different format for analysis. Tanner: data is being forwarded to IRIS, started last week. Victor: there may be something wrong with the instrument response information |
- | * frames: making frames (mid February now, trying to catch up) | + | * frames: |
- | * data quality shifts: working on the data quality monitor, need some time for it. | + | * data quality shifts: |
2) Planning next visit (Mar 23 - Apr 3) | 2) Planning next visit (Mar 23 - Apr 3) | ||
- | * locations, foam panels, granite tiles, network, GPS: Vuk had a discussion with Bryce et al. They are currently installing the fiber at the 2000 level. Currently planning 3 stations there. | + | * 2000 level: {{groups: |
- | * 2000 level: {{groups: | + | * locations, foam panels, granite tiles, network, GPS: Vuk asked for 15 foam panels to be moved to the 2000 level. |
- | * batteries, chargers | + | * batteries, chargers: Terry putting together the diode boxes. The power at the 2000 level will not be sufficient to recharge 20 batteries overnight. Looking at another solution where the batteries could be charged slower (2-3 days). Bryce offered to help with these, they could visit the 2000 level once a month and swap the batteries for us. |
- | * radios | + | * radios: purchased mast, should be delivered soon. |
+ | * Victor: in July/August we could have a student from Lee Liberty for active seismic measurements. Victor will follow up in April. | ||
+ | * Vuk: we will also have to borrow Octans. Will contact PASSCAL about this after the next trip. | ||
3) Analysis of existing data | 3) Analysis of existing data | ||
* radiometer approach (Noah, Tanner): {{groups: | * radiometer approach (Noah, Tanner): {{groups: |