This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | |||
groups:homestake:meetings:20150305 [2015/03/05 10:49] – mandic | groups:homestake:meetings:20150305 [2015/03/05 16:42] (current) – mandic | ||
---|---|---|---|
Line 14: | Line 14: | ||
2) Planning next visit (Mar 23 - Apr 3) | 2) Planning next visit (Mar 23 - Apr 3) | ||
- | * locations, foam panels, granite tiles, network, GPS: Vuk had a discussion with Bryce et al. They are currently installing the fiber at the 2000 level. Currently planning 3 stations there. | + | * 2000 level: {{groups: |
- | * 2000 level: {{groups: | + | * locations, foam panels, granite tiles, network, GPS: Vuk asked for 15 foam panels to be moved to the 2000 level. |
- | * batteries, chargers: Terry putting together the diode boxes | + | * batteries, chargers: Terry putting together the diode boxes. The power at the 2000 level will not be sufficient to recharge 20 batteries overnight. Looking at another solution where the batteries could be charged slower (2-3 days). Bryce offered to help with these, they could visit the 2000 level once a month and swap the batteries for us. |
- | * radios: purchased mast | + | * radios: purchased mast, should be delivered soon. |
* Victor: in July/August we could have a student from Lee Liberty for active seismic measurements. Victor will follow up in April. | * Victor: in July/August we could have a student from Lee Liberty for active seismic measurements. Victor will follow up in April. | ||
- | * Vuk: we will also have to borrow Octans | + | * Vuk: we will also have to borrow Octans. Will contact PASSCAL about this after the next trip. |
3) Analysis of existing data | 3) Analysis of existing data | ||
* radiometer approach (Noah, Tanner): {{groups: | * radiometer approach (Noah, Tanner): {{groups: |