Go to the U of M home page
School of Physics & Astronomy
School of Physics and Astronomy Wiki

User Tools


groups:homestake:meetings:20150305

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
groups:homestake:meetings:20150305 [2015/03/05 10:49] mandicgroups:homestake:meetings:20150305 [2015/03/05 16:42] (current) mandic
Line 14: Line 14:
  
 2) Planning next visit (Mar 23 - Apr 3) 2) Planning next visit (Mar 23 - Apr 3)
-  * locations, foam panels, granite tiles, network, GPS: Vuk had a discussion with Bryce et al. They are currently installing the fiber at the 2000 level. Currently planning 3 stations there. +  * 2000 level{{groups:homestake:meetings:homestake_2000level.png|schematic}} Vuk had a discussion with Bryce et al. They are currently installing the fiber at the 2000 level. Currently planning 3 stations there, all northwest from the existing stations (i.e. northwest from the yellow triangle in the linked schematic). Two of the stations will require batteries, the third already has a concrete pad, power and network. They are already installing the network cable, should be done this week.   
-  * 2000 level: {{groups:homestake:meetings:homestake_2000level.png|schematic}} +  * locations, foam panels, granite tiles, network, GPS: Vuk asked for 15 foam panels to be moved to the 2000 level. Should also have enough granite tiles, but Vuk found a local vendor in Rapid City that carries them. Jamey installed another splitter in the GPS distribution system that will cover the 2000 level, Tanner confirmed it works well. 
-  * batteries, chargers: Terry putting together the diode boxes +  * batteries, chargers: Terry putting together the diode boxes. The power at the 2000 level will not be sufficient to recharge 20 batteries overnight. Looking at another solution where the batteries could be charged slower (2-3 days). Bryce offered to help with these, they could visit the 2000 level once a month and swap the batteries for us.  
-  * radios: purchased mast+  * radios: purchased mast, should be delivered soon.
   * Victor: in July/August we could have a student from Lee Liberty for active seismic measurements. Victor will follow up in April.   * Victor: in July/August we could have a student from Lee Liberty for active seismic measurements. Victor will follow up in April.
-  * Vuk: we will also have to borrow Octans+  * Vuk: we will also have to borrow Octans. Will contact PASSCAL about this after the next trip.
  
 3) Analysis of existing data 3) Analysis of existing data
   * radiometer approach (Noah, Tanner): {{groups:homestake:meetings:rwavediagnostics4.pdf|pdf}}   * radiometer approach (Noah, Tanner): {{groups:homestake:meetings:rwavediagnostics4.pdf|pdf}}
groups/homestake/meetings/20150305.1425574160.txt.gz · Last modified: 2015/03/05 10:49 by mandic