Homestake Meeting Minutes, 04/30/15
Attending: Tanner, Daniel, Gary, Pat, Victor, Noah, Vuk
Homestake wiki: https://zzz.physics.umn.edu/groups/homestake/home
Our agenda:
Homestake status:
1700: missing the GPS link. Probably GPS unit in Q330 not working, try to replace it.
2000A: missing entirely, can't talk to it. Tanner talked to Jamey, can talk to the switch at this station, so the power should be on. Have to visit it and troubleshoot.
2000E: unlock seismometer? replace hardware? Gary: there is a screw on each of the STS-2 feet that may need to be adjusted. But likely the issue is more than just these feet, could be a site inducing tilt events. Look for water and other obvious problems. If we see nothing, we should replace the sensor.
Yates: power box replacement? Gary: PASSCAL is sending the power box and replacement cables. The problem should be one of these. We will also have several batteries, will need to replace the one at Yates. Daniel and Tanner can check it out when they arrive on Thu May 14, and replace the battery. COuld try to read the power coming off of the solar panel.
data quality shifts going on. Vuk: could use the power fluctuations in surface stations as a diagnostic… If it stops, it's a sign of trouble.
data flow: Daniel and Tanner: seems stable. Daily email notifications still state only 11 stations. Tanner: Gary probably needs to update the metadata to fix this…
other? Tanner: had a power outage a few weeks ago, talked to admins but no clear reason. Also, they will be moving the servers in mid-late May, so there will be an outage then as well. Can always go back to get the data, rsync-ing or scp-ing. Caltech and IU would also have to do it, scp-ing from Homestake works fine. Vuk will talk with UMN admins to figure out how to minimize the down-time due to the move.