-====== Filling in the Infrastructure Requirements ====== 
- 
-  * [[faarm:​faarmi|Clean Facility Requirements]] Prisca Cushman 
-  * [[faarm:​shieldi|Water Shield]] Prisca Cushman, Jeff Martoff? Kara Keeter 
-    * {{:​dnsi-09-20544_dufrane_.pdf|Dufrane Proposal for water shield}} 
-  * [[faarm:​immersioni|Ultra-Sensitive Immersion Tank]] Kara Keeter 
-  * [[faarm:​gammai|Gamma Counting Stations]] ​ DongMing Mei 
-  * [[faarm:​alphabeti|Alpha Counting Stations]] Richard Schnee 
-  * [[faarm:​betai|Beta/​Alpha Sensitive Surface Screeners ]] Richard Schnee 
-  * [[faarm:​newscreeni|Novel Screeners and R&D Space]] Richard Schnee, Prisca Cushman 
-  * [[faarm:​machinei|Clean Machine Shop]] Prisca Cushman 
-  * [[faarm:​chemi|Wet Chemistry]] DongMing Mei 
-  * [[faarm:​bioi|Bio storage and sample prep]] Tullis Onstott, Tom Kieft, Tommy Phelps 
-  * [[faarm:​commoni|Cryogen infrastructure]] Prisca Cushman 
-  * [[faarm:​wateri|Water purification infrastructure]] Kara Keeter 
-  * [[faarm:​purei|Electroforming]] DongMing Mei 
-  * [[faarm:​shallowi|Intermediate Overburden Level]] DongMing Mei 
-  * [[faarm:​surfacei|Surface]] DongMing Mei 
- 
- 
-Possible new WBS Structure 
-  - 4850 Facility (all items inside are class 2000)  
-    - Clean Facility Requirements 
-    - Water Shield 
-    - Immersion Tank (inside shield) 
-    - Gamma Counting (inside shield) 
-    - Alpha Counting (inside shield) 
-    - Beta Counting ​ (inside shield) 
-    - R&D Space  (inside shield) 
-    - Clean Machine Shop 
-    - Common clean storage and assembly space 
-    - Office Space 
-    - Wet chemistry 
-    - Bio Sample & Storage 
-  - 4850 Shared Infrastructure 
-    - Water Purification 
-    - Cryogens (purification,​ liquification,​ storage) 
-    - Electroforming 
-  - Intermediate Overburden Facility & Infrastructure 
-    - Solid Materials Storage 
-    - Screeners 
-  - Surface Facility & Infrastructure 
-    - NAA radiochemistry 
-    - Screeners 
-    - Clean Machine Shop 
-    - ICPMS & Characterization (ion beam, other mass spec) 
-    - Laser isotope separation 
-  - Design conventional facilities (Petersen, Hulne, Holland) 
-    - Develop conventional facilities WBS (and integrate with overall WBS) 
-    - Develop facility program and design criteria 
-    - Develop conceptual design of surface and underground facilities 
-    - Address critical requirements 
-    - Develop design and construction schedules 
-    - Develop cost estimates for WBS items 
-    - Prepare Conceptual Design Report 
-  - Characterization and Monitoring 
-    - radon + mitigation plan 
-    - cavern radioactivity 
-    - cosmogenic activity 
-  - Integration 
-    - collaboration meetings 
-    - synergistic activities 
-  - E&O 
-  
- 
  
  
  
  
faarm.txt · Last modified: 2009/12/22 12:42 by ben