Campuses:
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revision | |||
| planning [2011/04/18 15:01] – [Experimental Needs] 128.101.214.140 | planning [2011/05/09 12:33] (current) – [Gravity Meter] 24.245.16.19 | ||
|---|---|---|---|
| Line 62: | Line 62: | ||
| === Plan for startup === | === Plan for startup === | ||
| ==== Gravity Meter ==== | ==== Gravity Meter ==== | ||
| - | === Immediate needs === | + | === Immediate needs === | 
| - | === Plan for startup === | + | === Plan for startup === The start up has been accomplished | 
| - | When possible, the grounded meter should be restarted because the data collected at the Soudan Mine is better for showing an annual cycle in the baseline noise of gravity measurements. | + | |
| ==== Update from Marvin Marshak (Saturday, April 16) ==== | ==== Update from Marvin Marshak (Saturday, April 16) ==== | ||