Line 1: Line 1:
 +Possible new WBS Structure 
 +  - 4850 Facility (all items inside are class 2000)  
 +    - Clean Facility Requirements 
 +    - Water Shield 
 +    - Immersion Tank (inside shield) 
 +    - Gamma Counting (inside shield) 
 +    - Alpha Counting (inside shield) 
 +    - Beta Counting ​ (inside shield) 
 +    - R&D Space  (inside shield) 
 +    - Clean Machine Shop 
 +    - Common clean storage and assembly space 
 +    - Office Space 
 +    - Wet chemistry 
 +    - Bio Sample & Storage 
 +  - 4850 Shared Infrastructure 
 +    - Water Purification 
 +    - Cryogens (purification,​ liquification,​ storage) 
 +    - Electroforming 
 +  - Intermediate Overburden Facility & Infrastructure 
 +    - Solid Materials Storage 
 +    - Screeners 
 +  - Surface Facility & Infrastructure 
 +    - NAA radiochemistry 
 +    - Screeners 
 +    - Clean Machine Shop 
 +    - ICPMS & Characterization (ion beam, other mass spec) 
 +    - Laser isotope separation 
 +  - Design conventional facilities (Petersen, Hulne, Holland) 
 +    - Develop conventional facilities WBS (and integrate with overall WBS) 
 +    - Develop facility program and design criteria 
 +    - Develop conceptual design of surface and underground facilities 
 +    - Address critical requirements 
 +    - Develop design and construction schedules 
 +    - Develop cost estimates for WBS items 
 +    - Prepare Conceptual Design Report 
 +  - Characterization and Monitoring 
 +    - radon + mitigation plan 
 +    - cavern radioactivity 
 +    - cosmogenic activity 
 +  - Integration 
 +    - collaboration meetings 
 +    - synergistic activities 
 +  - E&O