Telecon Notes June 20, 2018
Attendance: Shaul, Al, Jamie, Bill J.
Notes by: Shaul
Agenda
Review of TeamX slides
Instrument:
summary
systems
cost
optics
Mechanical/Configuration
Focal Planes and Detectors
Thermal
Mission:
summary
systems
instruments
cost
mission design
ACS
Power
Configuration
Mechanical
Propulsion
Thermal
CDS (computer and data system?)
SVIT (System Verification Integration and Testing?)
Telecom
Ground Systems
Report writing
schedule
First draft by Sept. 1 (first round of text + key figures)
October 1: 2nd draft
October 30: 3rd semi-final draft
Nov. 1: submit to external review
Nov. 21: receive external review comments
Nov. 21- Dec 15: implement external review changes
Dec. 15-31: final review
Dec. 31, 2018 - Submit
platform: GitHub
assignments + review of status
Notes
TeamX Slides:
Shaul suggests that subset of EC will review the TeamX slides. The goal is to fix and flag issue that may jump out for SOMA.
Are TeamX slides going to the decadal panel? Shaul thinks not, but the decadal can request them.
Jamie, Al suggest to add 'heritage' slides to the TeamX slides to increase SOMA's confidence
Bill will review the SVIT slides; Al, Jamie, Shaul will review the entire set
We will review comments by next week
Report:
Two different audiences: the cost estimators and the decadal panel. Balance is difficult.
Shaul suggested using additional narrative together TeamX slides to add material for SOMA.
Galactic science 5 pages is too long; Al, Jamie suggest to reduce to 3, and augment the 'mission' page allocation.