Priority items for the next 2 months (next TeamX) and 5 months (PICO workshop) (all)
draft report exists. final version for distribution should be in ~2 weeks.
PICO was fine on engineering and costs, no showstoppers.
Instrument was $180M, agreed with goal.
Cooling was majority, $90M. Other details to come.
March TeamX is instrument and mission. These results go directly to Decadal panel.
May workshop in Minneapolis to plan for report and Decadal.
What tech development do we want to highlight for the final report? Some probes are planning far in the future with requirements for significant tech developement. We may want to discuss some.
KG: Communication bandwidth? Are we still bandwidth limited.
SH: With 12k detectors, Nyquist sampling each pixel at the appropriate rate for its smallest beam, 4 hrs of DSN, and 150 Mbps there is no problem. Roughly a 2x margin still.
KG: Does antenna tracking limit us?
Ed: This will be steerable antenna, but mass can impact precession, spin, craft dynamics etc. There is a cost tradeoff to be accounted for.
KG: Large (~1m) HWP for space.
KG: lowering the cost of cooling.
TeamX (somewhat new)Optics, and Focal Plane (Karl)