Campuses:
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| imagerteleconnotes20180228 [2018/02/28 15:53] – wenxx181 | imagerteleconnotes20180228 [2018/02/28 16:27] (current) – kyoung | ||
|---|---|---|---|
| Line 21: | Line 21: | ||
| * **Planck decontamination, | * **Planck decontamination, | ||
| + | * Someone needed to write ~ 1 paragraph. | ||
| + | * From Bill: | ||
| * CPV (commissioning and performance verification) at L2 | * CPV (commissioning and performance verification) at L2 | ||
| * Telemetry checkout, cryogenic check, normal receiver operation etc. | * Telemetry checkout, cryogenic check, normal receiver operation etc. | ||
| * For PICO, the best mode needs to be decided; spinning or spinning + precession; we have to spin to stabilize. Different spin rate is something interesting. | * For PICO, the best mode needs to be decided; spinning or spinning + precession; we have to spin to stabilize. Different spin rate is something interesting. | ||
| - | * baking primary | + | * baking primary |
| * Passively cool, during the flight to L2 | * Passively cool, during the flight to L2 | ||
| Line 76: | Line 78: | ||
| * Bill: angular calibration, | * Bill: angular calibration, | ||
| * constrained bandpass mismatch, using data itself. It’s a big question to reach r<10^-4. | * constrained bandpass mismatch, using data itself. It’s a big question to reach r<10^-4. | ||
| - | * 2 month is the tight. sort of Planck schedule.1 month inserted | + | * 2 month is the tight. sort of Planck schedule. |
| * in flight correction of HFI, the challenge is it’s difficult to do spectroscopy tests on the whole, which are in fact dependent on the whole system. | * in flight correction of HFI, the challenge is it’s difficult to do spectroscopy tests on the whole, which are in fact dependent on the whole system. | ||
| - | * cost, driver, 3 level | + | * cost, driver, 3 level of testing set ups |
| * modest, device, institutions | * modest, device, institutions | ||
| * large, full focal plane, calibration equatment needed, time needed | * large, full focal plane, calibration equatment needed, time needed | ||