Campuses:
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| imagerteleconnotes20180228 [2018/02/28 16:26] – kyoung | imagerteleconnotes20180228 [2018/02/28 16:27] (current) – kyoung | ||
|---|---|---|---|
| Line 78: | Line 78: | ||
| * Bill: angular calibration, | * Bill: angular calibration, | ||
| * constrained bandpass mismatch, using data itself. It’s a big question to reach r<10^-4. | * constrained bandpass mismatch, using data itself. It’s a big question to reach r<10^-4. | ||
| - | * 2 month is the tight. sort of Planck schedule.1 month inserted | + | * 2 month is the tight. sort of Planck schedule. |
| * in flight correction of HFI, the challenge is it’s difficult to do spectroscopy tests on the whole, which are in fact dependent on the whole system. | * in flight correction of HFI, the challenge is it’s difficult to do spectroscopy tests on the whole, which are in fact dependent on the whole system. | ||
| - | * cost, driver, 3 level | + | * cost, driver, 3 level of testing set ups |
| * modest, device, institutions | * modest, device, institutions | ||
| * large, full focal plane, calibration equatment needed, time needed | * large, full focal plane, calibration equatment needed, time needed | ||