Line 78: Line 78:
           * Bill: angular calibration, independent may be demanding.           * Bill: angular calibration, independent may be demanding.
           * constrained bandpass mismatch, using data itself. It’s a big question to reach r<10^-4.           * constrained bandpass mismatch, using data itself. It’s a big question to reach r<10^-4.
-          * 2 month is the tight. sort of Planck schedule.1 month inserted to do testing, not sure the cost.+          * 2 month is the tight. sort of Planck schedule. better to add 1 month to do testing, not sure the cost.
           * in flight correction of HFI, the challenge is it’s difficult to do spectroscopy tests on the whole, which are in fact dependent on the whole system.           * in flight correction of HFI, the challenge is it’s difficult to do spectroscopy tests on the whole, which are in fact dependent on the whole system.
         * cost, driver, 3 level of testing set ups         * cost, driver, 3 level of testing set ups