Go to the U of M home page
School of Physics & Astronomy
Probe Mission Study Wiki
imagerteleconnotes20180228

This is an old revision of the document!


Telecon 20180228

Attending: Bill, Tom, Kris, Hannes, Shaul, Karl, Qi

Notes by : Qi

Agenda

Notes

  • Planck decontamination, cooling, and in-orbit checkout
    • CPV (commissioning and performance verification) at L2
      • Telemetry checkout, cryogenic check, normal receiver operation etc.
      • For PICO, the best mode needs to be decided; spinning or spinning + precession; we have to spin to stabilize. Different spin rate is something interesting.
    • baking primary (Qi did not catch this)
    • Passively cool, during the flight to L2
imagerteleconnotes20180228.1519852412.txt.gz · Last modified: 2018/02/28 15:13 by wenxx181