Line 12: Line 12:
  
 === Notes === === Notes ===
-  * Mechanical design of focal plane+Mechanical design of focal plane
     * Jamie shared the experience with Bicep3 focal plane:     * Jamie shared the experience with Bicep3 focal plane:
       * heat sink:  gold frames and wires around perimeter of wafer. They found contact resistance is the main issue. Biggest thermal impedance comes from between gold and silicon; at 100mK, conductance is mainly through electrons, pushing harder does not help.       * heat sink:  gold frames and wires around perimeter of wafer. They found contact resistance is the main issue. Biggest thermal impedance comes from between gold and silicon; at 100mK, conductance is mainly through electrons, pushing harder does not help.
       * 4 clamps push down the wafers, but wafers can still slide; clamps don't short the instruments.       * 4 clamps push down the wafers, but wafers can still slide; clamps don't short the instruments.
       * In theory, gold wires and bars play the role of RF shields.       * In theory, gold wires and bars play the role of RF shields.
-    * PICO has a preliminary design, which can be used to estimate the mass already +    * PICO has a preliminary design, which can be used to estimate the mass already; more details about how to mount wafers on frames are ongoing 
-    * +    * material of frame: copper vs invar? Jamie: invar has high capacity, large mount of magnetic material 
 +    * bump bonds should be straightforward on PICO time scale  
 +    * Karl knows the size of TDM, **Qi to find out what Karl has concluded (AI)** 
 + 
 +Report writing  
 +    * page 4, section 3 Instrument is most relevant 
 +    * internal review 
 +    * by the end of August 
 + 
 +Thermal design 
 +    * we don't have one yet, JPL is responsible. 
 + 
 +**No objection against changing the telecon cadence to 2 weeks.** 
  