Telecon Notes 20170719
Agenda
Workshops updates
Foregrounds (Raphael? may not be able to attend telecon)
Science+Complementarity (Mark, Bill, Shaul)
Overlap between Foregrounds and Galactic Science WG (Dave Chuss, Laura Fissel; see draft letter below)
CMBPol? Inflation Probe? CMB Probe? CMBP? Other suggestions?
NASA Guidance for cost, mass, power, margins (Amy)
-
Actions
Finalize Foreground Workshop Details (Raphael, by next week)
Contact Kovack about a Probe update in the next S4 meeting (Shaul, this week)
Contact Carlstrom about workshop coordination (Shaul, this week)
Notes
Cost (Amy)
Tech development is risky. Can't afford to do a lot. However, we will need to include SOME in there…probably detector/readout (best science return vs risk). NASA says we ARE allowed to include technologies not at TRL 5. However, it would need to get up to TRL 5 by phase A (2023). The cost is outside the $1B cap. BUT it will be reviewed and managed.
Cap include $150M for launch, operations, management. The amount available for all of this, but budget left for the instrument itself could be less than $200M.
We are a risk classification B. Single fault tolerant.
Power - need a 75% contingency + margin on power. We have lots of high power stuff. Putting all these together means we may need deployable solar array. Not much risk, but it is a cost. To get this down, we would need to know our power needs *very* well.
Start date of the project is October 2023. Tech development would need to be done prior to this.