Go to the U of M home page
School of Physics & Astronomy
Probe Mission Study Wiki
systematicswg:telecons:2017-12-13:start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
systematicswg:telecons:2017-12-13:start [2017/12/13 11:04] bcrillsystematicswg:telecons:2017-12-13:start [2017/12/13 11:51] (current) bcrill
Line 3: Line 3:
   * [[https://docs.google.com/document/d/1yVAmQFK-bjenhiRa_EeJqsB29-EiPNk2-JQBh2TSXvo/edit?usp=sharing | Google Doc with parameters]]   * [[https://docs.google.com/document/d/1yVAmQFK-bjenhiRa_EeJqsB29-EiPNk2-JQBh2TSXvo/edit?usp=sharing | Google Doc with parameters]]
    
-  * Julian: simulation efforts almost underway.  Massive CMB-S4 sim underway for next week: Berkeley group will have almost all of Cori for a couple of days.  In principle, if all goes well, and a PICO focal plane definition is available, can piggyback 12500 detectors with noise maps.+  * Julian: simulation efforts almost underway.  Massive CMB-S4 sim underway for next week: Berkeley group will have almost all of Cori for a couple of days.  In principle, if all goes well, and a PICO focal plane definition is available, can piggyback 12500 detectors for ~4 years with noise maps. 
 + 
 +  * Systematics could later be simulated, and probably don't all require full mission/full focal plane. 
 +  * note that Andrea Zonca has on-the-fly bandpass mismatch tool integrated. 
 + 
 +  * What does Julian need from Shaul: A Focal plane definition is the main thing.  should be sorted out today at EC.  He'll also check in on noise spectrum definition. 
 + 
 +  * Foreground workshop from 2 weeks ago looked at sky models 
 +  * Foreground realisations in the first instance will be convolved and added to the noise models, skipping time series. 
 + 
 +  * Maurizio to update analysis he did for CORE by looking at S/N and time scales over which dipole signal varies min/max.  Mid-January is LSPC review doc deadline, so he should be able to look at this for PICO as soon as he's done with that. THANK YOU, Maurizio. 
 + 
 +  * Brendan to follow up again with Brad to try to get an update on GRASP sim scope/timescale 
 +  
 +  * Next week, we'll have a discussion with the Cantabria group about their cubesat calibrator concept. 
 + 
systematicswg/telecons/2017-12-13/start.1513184667.txt.gz · Last modified: 2017/12/13 11:04 by bcrill