Go to the U of M home page
School of Physics & Astronomy
Assay and Acquisition of Radiopure Materials

User Tools


engineering:apr15_10

Agenda for April 15, 2010

  • Working Group Reports (see jobs below for reference)

Water Shield

Make it real, talk to companies, do the engineering e.g.
  • Door or labyrinth Beaver Pixs
  • Acrylic tunnel costs (Lee reports)
  • Outer tank engineering
Develop infrastructure into shield (ductwork, electrical etc)

Screener Group

Work with Yuen-Dat to compile results of survey
Define parameters of shielding and common elements between screeners
Plan for screening at Sanford and schedule of installation and move

Immersion Tank

Continue cost and schedule for CTF
compile relevant sections of survey (poll community about the functionality of the ultra sensitive screener

Characterization

short term plans for this summer - involve other groups
long term plans for neutron work
engineering/apr15_10.txt · Last modified: 2010/04/15 09:01 by prisca